My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2529-01
>
Ordinances
>
Ordinance 2529-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2014 1:41:19 PM
Creation date
4/7/2014 1:41:08 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2529-01
Date
8/22/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elementary ((161+143)/384)x 100 = 79.17% __ <br /> Middle School ( 111/122)x 100 = 90.98% <br /> High School (197 /240) x 100 = 82.08 % <br /> Note that at the middle school level, the maximum enrollment growth number (111 FTE) is <br /> projected for the year 2002, after which enrollment is anticipated to drop. Utilizing relocated <br /> portables during this time avoids the need for building new permanent space. <br /> Existing units: From Table 2. <br /> Portable Relocations Required: From Table 8. <br /> Cost Per Unit to Relocate: Average cost to relocate and set up a portable, including stairs, <br /> skirting, ramping, and hookups for telephone, power, data, fire alarm and security systems. <br /> Relocatable Facilities Cost: Cost per unit multiplied by number of units to be relocated. This <br /> is adjusted by the Growth Factor percentage to deduct costs related to existing deficiencies. <br /> Relocatable Facilities Capacity/Unit: Same as capacity of basic educational programs in <br /> permanent facilities (see section 3). <br /> Relocatable Facilities Capacity: Capacity per unit multiplied by the number of units to be <br /> relocated. This is adjusted by the Growth percentage to deduct costs related to existing <br /> deficiencies. <br /> Total Relocatable Facilities Capacity: From Table 2. <br /> Existing Portable Square Footage: From Table 2. <br /> 4. State Match Credit Variables <br /> BOECKH Index. This number is generated by the E.H. Boeckh Company and is used by OSPI <br /> as a guideline for determining the area cost allowance for new school construction. The index <br /> is an average of a seven-city building cost index for commercial and factory buildings in <br /> Washington State, and is adjusted every two months for inflation. The June,2000 BOECKH <br /> Index is $101.63. <br /> State Match Percentage. The State match percentage is the proportion of funds that are <br /> provided to the school districts, for specific capital projects, from the State's Common School <br /> Construction Fund. These funds are disbursed based on a formula which calculates the District <br /> assessed valuation per pupil relative to the whole state assessed valuation per pupil to establish <br /> the percentage of the total project to be paid by the State. <br /> If a project were eligible for state matching funds, the Everett School District would receive <br /> basic project reimbursement on a State matching ratio. However, because the State has <br /> determined that the Everett District has excess student capacity according to the State's <br /> formula, the Everett District is not eligible for new construction State match at this time. <br /> Therefore, the effective State match ratio is zero. If the Everett School District was eligible to <br /> receive state matching funds, the 1999 matching ratio, according to OSPI, would be 52.62%. <br /> Everett School District Section 6 - 8 Capital Facilities Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.