My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2529-01
>
Ordinances
>
Ordinance 2529-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2014 1:41:19 PM
Creation date
4/7/2014 1:41:08 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2529-01
Date
8/22/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORTAL #4 RECONSTRUCTION <br /> Description: .Demolish the existing structure at Portal #4 and replace with a <br /> new building. Remove all slide gates in the portal and replace with butterfly <br /> valves. Add new valves between the#4 line and Portal 6. Supply power and <br /> instrumentation to the Portal 4 area. <br /> Location: 1 mile west of Lake Chaplain at Portals #4 and #6 <br /> Justification:. The existing building at Portal #4 is rotten and is no longer able to <br /> carry snow or wind loads. A cross connection between filtered water and lake <br /> water exists at this site. Manual valve adjustment at this remote site will be <br /> replaced with remote operation from the Water Filtration Plant. Instrumentation <br /> will monitor water elevation at Portal #4 and prevent an overflow. <br /> Amounts in$1,000 <br /> Laid&li tt r ����� $0 <br /> Design& m $60----- $ <br /> uti <br /> 0311 nan $540$540���� <br /> Mer $0 <br /> $0 <br /> Tdal $60 $540 $0 $0 $0 $0 $800 <br /> General Find ------ $0 <br /> Mtigation Fees $0 <br /> Assessments $0 <br /> Gants $0 <br /> Fetes $60 $540---- WOO <br /> $0 <br /> Tdat $60 $540 $0 $0 $0 $0 $600 <br /> C:VTEMP,CAP-FAC2001.doc(YJ 3119/01) 1/° <br />
The URL can be used to link to this page
Your browser does not support the video tag.