Laserfiche WebLink
VALVE HOUSE #1 <br /> Description: Upgrade and replace the existing Valve House No. 1, which <br /> controls water flow to the low and intermediate pressure zones (all of north <br /> Everett). <br /> Location: Rucker Hill, 35th and Sharon Court, adjacent to Reservoir No. 1 <br /> Justification: (Need/Demand) The existing facility was constructed in the <br /> 1920's, and still has some of the original pipe and fittings, including riveted steel <br /> pipe and leaded valve joints. The facility has reached its service life and needs <br /> replacing to keep secure the water service in north Everett. <br /> Amounts in$1,000 <br /> Land&rix arway ��� so <br /> ��� <br /> Design&En4ne ring $200 <br /> Ca tn,dian $&X) $400 $1,200 <br /> Otter $0 <br /> Total $1,000 $400 $o $o $o $0 $1,400 <br /> i i�' i i I I rc sv a-�air e' r G e i <br /> Genera Fund ---- $0 <br /> - <br /> MtigaUon Fees ------ $0 <br /> Assessments $0 <br /> Grants $0 <br /> Rates $1,000 $400 $1,400 <br /> Other $0 <br /> $0 <br /> Total $1,000 $400 $o $o $o $0 $1,400 <br /> C:ITEMPICAP-FAC2001.dot(YJ 3/19/01) L / <br />