Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br />Page 2 of 43 <br />AASHTO “Guide for the Development of Bicycle Facilities” <br />Washington State Department of Transportation, “Bridge Design Manual” <br />Washington State Department of Transportation, “Design Manual” <br />Washington State Department of Transportation, “Highway Runoff Manual” <br />Washington State Department of Transportation, “Materials Laboratory Outline” <br />Washington State Department of Transportation, “Construction Manual” <br />Washington State Department of Transportation, “Local Agency Guidelines” <br />Washington State Department of Transportation, “Standard Specifications for Road and <br />Bridge Construction” <br />Highway Research Board’s Manual entitled “Highway Capacity” <br />CONSULTANT and Washington State Department of Transportation, “Manual on <br />Uniform Traffic Control Devices for Streets and Highways” <br />Standard drawings prepared by AGENCY shall be used as a guide in all cases where they <br />fit design conditions. <br />WSDOT Hydraulics Manual <br />Project Team: <br />The Project team is composed of the following: <br />A.Owner – City of Everett Public Works (AGENCY) <br />B. Prime Consultant – DEA (CONSULTANT) <br />C. Subconsultant – Perteet, Inc (Perteet) <br />D. Subconsultant – HWA Geosciences, Inc (HWA) <br />E.Subconsultant – Kimley-Horn & Associates, Inc (Kimley-Horn) <br />F.Subconsultant – LMN Architects (LMN) <br />G.Subconsultant – Ott-Sakai & Associates, LLC (Ott-Sakai) <br />H.Subconsultant – EnviroIssues (EnviroIssues) <br />I.Subconsultant – Commonstreet Consulting (Commonstreet) <br />The following work elements present a summary of the services associated with the Project: