My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br />Page 2 of 43 <br />AASHTO “Guide for the Development of Bicycle Facilities” <br />Washington State Department of Transportation, “Bridge Design Manual” <br />Washington State Department of Transportation, “Design Manual” <br />Washington State Department of Transportation, “Highway Runoff Manual” <br />Washington State Department of Transportation, “Materials Laboratory Outline” <br />Washington State Department of Transportation, “Construction Manual” <br />Washington State Department of Transportation, “Local Agency Guidelines” <br />Washington State Department of Transportation, “Standard Specifications for Road and <br />Bridge Construction” <br />Highway Research Board’s Manual entitled “Highway Capacity” <br />CONSULTANT and Washington State Department of Transportation, “Manual on <br />Uniform Traffic Control Devices for Streets and Highways” <br />Standard drawings prepared by AGENCY shall be used as a guide in all cases where they <br />fit design conditions. <br />WSDOT Hydraulics Manual <br />Project Team: <br />The Project team is composed of the following: <br />A.Owner – City of Everett Public Works (AGENCY) <br />B. Prime Consultant – DEA (CONSULTANT) <br />C. Subconsultant – Perteet, Inc (Perteet) <br />D. Subconsultant – HWA Geosciences, Inc (HWA) <br />E.Subconsultant – Kimley-Horn & Associates, Inc (Kimley-Horn) <br />F.Subconsultant – LMN Architects (LMN) <br />G.Subconsultant – Ott-Sakai & Associates, LLC (Ott-Sakai) <br />H.Subconsultant – EnviroIssues (EnviroIssues) <br />I.Subconsultant – Commonstreet Consulting (Commonstreet) <br />The following work elements present a summary of the services associated with the Project:
The URL can be used to link to this page
Your browser does not support the video tag.