My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br />Page 3 of 43 <br />WORK ELEMENT 1 PROJECT MANAGEMENT <br />This work element includes administration of the contract between DEA (CONSULTANT) and <br />the AGENCY, preparation of monthly progress reports, and quality control necessary for the <br />Project. This task includes all administrative services needed to coordinate with the <br />subconsultant/s and to complete the Project on time and within budget. The following are the <br />categorized activities associated with this work element: <br />1.1 Monthly Progress Reports, and Invoicing: <br />Progress reports will contain a narrative that identifies and describes significant <br />activities performed in the previous month and the significant planned activities for <br />the upcoming month. <br />1.2 Design Team Management: <br />Schedule and coordinate with the design team. <br />Prepare sub-consultant agreements as well as coordinate, budget, and review their <br />Project progress and submittals. <br />Prepare, monitor, and update the Project schedule. <br />Monitor the Project budget. <br />Prepare monthly billings, progress reports, and update monthly the Project schedule. <br />Maintain regular informal contact through telephone discussions and electronic mail. <br />Obtain, with assistance from the AGENCY, rights of entry necessary for geotechnical <br />studies, etc. <br />1.3 Meetings <br />Weekly or bi-weekly meetings with AGENCY to coordinate and share progress. <br />Biweekly meetings with internal team and including subconsultants when needed. Up <br />to twenty-four (24) team meetings are assumed for the duration of the design <br />activities. <br />Deliverables: <br />Progress Reports <br />Meeting Minutes <br />Monthly Invoicing <br />Project Schedule
The URL can be used to link to this page
Your browser does not support the video tag.