Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br />Page 5 of 43 <br />2.6 Right-of-Way and Boundary Resolution(s) <br />The activities in this section will be resolving existing right-of-way to be researched and along <br />the survey limits shown in Figure A (yellow and orange areas). <br />It is estimated that up to thirty-eight (38) Title Reports with underlying documents will be <br />needed in order to more fully research and resolve the right-of-way. CONSULTANT will <br />provide a Title Reports listing to the AGENCY. The AGENCY will order and pay for the Title <br />Reports which will then be provided to the CONSULTANT upon receipt. <br />Assumptions: <br />Health, Safety, and Security are priorities. CONSULTANT personnel will not proceed if <br />the conditions are deemed unhealthy, unsafe, or not secure from harm of any type. <br />CONSULTANT is not responsible for any delays due to conditions outside of <br />CONSULTANT’s control. <br />Permits will not be required for CONSULTANT’s efforts. <br />Title Reports with underlying documents for the affected parcels to be provided by the <br />AGENCY. <br />A Record of survey/setting of property corners is not a part of these services. <br />Tree driplines are not a part of these services. <br />Confined space entry will not be required. <br />Drafting and basemaps will comply with current City of Everett Survey & CAD <br />Standards. <br />Geotechnical bores, potholes, hand holes, and test pit locations are NOT a part of these <br />tasks. <br />Trees greater than six-inch (6”) DBH will be located as a part of these tasks. <br />Rights of entry, if needed, will be accomplished by others prior to dispatching the field <br />crew. <br />The level of effort for this task is limited to the budgeted level of effort. <br />Deliverables: <br />AutoCAD Civil 3D 2022 survey base map, electronic copy. (Not to include terrain <br />model.) <br />AutoCAD Civil 3D 2022 terrain model, electronic copy. <br />.XML terrain model. <br />Signed PDF copy of the mapped areas, if required. <br />Field book notes, if required. <br />ASCII file of all topographic and control points, if required. <br />An ASCII file with point numbers, coordinates, elevations, and descriptions for each <br />survey point, with benchmarks and survey control points clearly identified. <br />Project Limits <br />The activities in this section will be a continuation of the completed TS&L survey topo map as <br />required for Final Design Phase engineering as shown in Figure A below. Project limits will be <br />apparent Right-of-Way to apparent Right-of-Way along all roadways in Figure A below.