My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 4 of 43 <br /> <br />WORK ELEMENT 2 SURVEYING AND MAPPING <br />This work element is performed by CONSULTANT to provide additional topographic survey <br />and basemapping as required for full design purposes. <br /> <br />The surveying effort in this phase will include the following activities: <br /> <br />2.1 Survey PM, Admin, QA/QC <br />This task includes the survey project management, administrative duties, and quality control <br />required for a project of this complexity and magnitude. Depending on the Project requirements, <br />CONSULTANT will assign a Survey Project Manager, Assistant Project Manager, and Survey <br />Quality Leader for this Project. <br /> <br />2.2 Survey Control <br />The activities in this section will be a continuation of the completed TS&L survey topo map as <br />required for Final Design Phase engineering. <br /> <br />This task includes the perpetuation of existing survey control into new areas as shown in <br />Figure A below. <br /> <br />2.3 Field Surveying and Mapping <br />The activities in this section will be a continuation of the completed TS&L survey topo map as <br />required for Final Design Phase engineering. This task includes field surveying and mapping <br />required for this specific effort as shown in Figure A below (orange area). <br /> <br />CONSULTANT may provide ground-based topographic survey to add to the basemaps at a 1” = <br />20’ scale and to update the DTM generated one (1)-foot contours utilizing traditional survey <br />methods. <br /> <br />2.4 Utility Surveying Services <br />The activities in this section will be a continuation of the completed TS&L survey topo map as <br />required for Final Design Phase engineering. This task includes utility surveying services <br />required for this specific effort as shown in Figure A below (orange area). <br /> Surface Observable utilities will be located as found within the surveying limits. <br /> Measure Downs for sewer manholes, catch basins and storm drain manholes with pipe <br />size, material, direction, and invert elevations will be obtained, if possible, at each <br />structure. <br /> A private underground utility locating firm will be sub-contracted for marking <br />underground conductible utilities. <br /> <br />2.5 Office Processing <br />This task includes the office processing of the collected survey data, data extraction, field book <br />note reductions, CADD drafting, and other duties required for the generation of the <br />deliverable(s). <br />
The URL can be used to link to this page
Your browser does not support the video tag.