City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 4 of 43 <br /> <br />WORK ELEMENT 2 SURVEYING AND MAPPING <br />This work element is performed by CONSULTANT to provide additional topographic survey <br />and basemapping as required for full design purposes. <br /> <br />The surveying effort in this phase will include the following activities: <br /> <br />2.1 Survey PM, Admin, QA/QC <br />This task includes the survey project management, administrative duties, and quality control <br />required for a project of this complexity and magnitude. Depending on the Project requirements, <br />CONSULTANT will assign a Survey Project Manager, Assistant Project Manager, and Survey <br />Quality Leader for this Project. <br /> <br />2.2 Survey Control <br />The activities in this section will be a continuation of the completed TS&L survey topo map as <br />required for Final Design Phase engineering. <br /> <br />This task includes the perpetuation of existing survey control into new areas as shown in <br />Figure A below. <br /> <br />2.3 Field Surveying and Mapping <br />The activities in this section will be a continuation of the completed TS&L survey topo map as <br />required for Final Design Phase engineering. This task includes field surveying and mapping <br />required for this specific effort as shown in Figure A below (orange area). <br /> <br />CONSULTANT may provide ground-based topographic survey to add to the basemaps at a 1” = <br />20’ scale and to update the DTM generated one (1)-foot contours utilizing traditional survey <br />methods. <br /> <br />2.4 Utility Surveying Services <br />The activities in this section will be a continuation of the completed TS&L survey topo map as <br />required for Final Design Phase engineering. This task includes utility surveying services <br />required for this specific effort as shown in Figure A below (orange area). <br /> Surface Observable utilities will be located as found within the surveying limits. <br /> Measure Downs for sewer manholes, catch basins and storm drain manholes with pipe <br />size, material, direction, and invert elevations will be obtained, if possible, at each <br />structure. <br /> A private underground utility locating firm will be sub-contracted for marking <br />underground conductible utilities. <br /> <br />2.5 Office Processing <br />This task includes the office processing of the collected survey data, data extraction, field book <br />note reductions, CADD drafting, and other duties required for the generation of the <br />deliverable(s). <br />