My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 13 of 43 <br /> <br />WORK ELEMENT 4 ENVIRONMENTAL PERMITTING <br />This Work Element is performed by Perteet to provide environmental permitting documentation <br />for the National Environmental Policy Act (NEPA), the State Environmental Policy Act (SEPA), <br />and limited local permits/approvals. Federal funding is anticipated to be administered through <br />WSDOT Local Programs. We assume WSDOT will be the lead coordinator for NEPA. For the <br />purposes of this Scope of Services, this Project can be authorized under a NEPA Categorical <br />Exclusion (CE). Environmental documentation produced under this scope of work will be based <br />on a single preferred alternative to be selected by others prior to PSE preparation and after <br />outreach is conducted by others. The necessary work elements associated with preparation of <br />NEPA and SEPA documentation are assumed under subtasks 4.1-4.6. <br />4.1 Critical Areas Documentation <br />To advance to permit ready documentation Perteet will conduct a targeted field investigation of <br />the Project site identified through the existing TS&L Environmental Memo. This effort will <br />confirm the presence or absence of critical areas, specifically wetlands, streams, and shorelines. <br />While preliminary review analysis in the TS&L phase suggests no wetlands occur within the <br />immediate Project area, field verification and data collection in and near the Area of Potential <br />Effect (APE) is warranted for developing a critical areas technical memorandum. The <br />Snohomish River, and its shoreline jurisdiction are known to occur in or near the Project area. <br /> <br />Field work will be conducted by two (2) Perteet environmental scientists over the course of no <br />more than one (1) field day. Delineation flags will be located by survey if wetlands are found. <br />The survey of located delineation flags will be used for Project related maps and information to <br />identify critical areas for avoidance of impacts. <br />This field verification and documentation are key to following up the desktop-based critical area <br />review completed in the existing TS&L Environmental Memo, which also identified floodplain <br />and habitat considerations. The field findings will be documented in a Critical Areas Technical <br />Memorandum, which will describe the methods, delineation results (if any), and regulatory <br />implications under NEPA and SEPA. This documentation will also support permit submittals, <br />including coordination with shoreline and critical area regulations. <br />Assumptions: <br /> Perteet will utilize the preliminary environmental data and findings gathered for the <br />TS&L planning phase. <br /> Based on the TS&L review, no wetlands occur in the Project area. <br /> The AGENCY’s stormwater outfall improvement Project is outside of this Project <br />scope. <br /> The AGENCY will coordinate access for Perteet and provide rights of entry as needed to <br />access the Project area. <br /> CONSULTANT will submit all deliverables/documents to the AGENCY after reviewing <br />Perteet’s submittals to the CONSULTANT.
The URL can be used to link to this page
Your browser does not support the video tag.