My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br />Page 36 of 43 <br />the 90% design will be responded to and incorporated. Constructability Review and <br />QA/QC activities are an inherent part of this element. <br />Deliverables: <br />PDF 11”x17” (half size) copy of Plans. <br />PDF copy of the 90% Specifications Manual. <br />PDF copy of the quantity Estimates and opinion of construction cost. <br />11.5 100% PS&E – Bid-ready <br />This work element item encompasses all the activities associated with the preparation of <br />the 100% Bid-ready Plans, Special Provisions and engineer’s opinion of construction cost <br />Estimate (PS&E). All Agency comments from the draft 100% design will be responded <br />to and incorporated. Constructability Review and QA/QC activities are an inherent part <br />of this element. <br />Deliverables: <br />PDF half size copy of the Bid-ready set of Plans. <br />PDF copy of full size electronically signed copy of the Bid-ready set of Plans. <br />PDF copy of finalized Specification Manual prepared per WSDOT LAG, and <br />Agency templates, in MS Word format. <br />PDF copy of the quantities Estimate and opinion of construction cost. <br />AutoCAD and/ or Civil 3D complete electronic drawing files. <br />Assumptions: <br />AGENCY to provide: <br />Title block and CAD standards <br />Contract Forms <br />Bid Procedures and Conditions <br />Division 1 - General Requirements, including applicable special provisions <br />The following table presents the anticipated Plan sheets for the Edgewater Creek Bridge <br />Replacement Project: <br />Sheet Name PS&E Assumed <br />Number of Sheets <br />PS&E Submittal Phase <br />30% 60% 90%, Draft <br />100% & 100% <br />Cover Sheet 1 X X X <br />Index Legend and Abbreviations 1 X X <br />Survey Control 2 X X <br />Site Prep and TESC 5 X X <br />Roadway Plan & Profile 6 X X X <br />Striping & Paving 6 X X <br />Roadway Typical Sections and Details 3 X X X <br />Drainage 8 X X <br />Channelization & Signing 5 X X X <br />Utilities 2 X X
The URL can be used to link to this page
Your browser does not support the video tag.