My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 35 of 43 <br /> <br />WORK ELEMENT 11 STRUCTURAL DESIGN <br />This work element is performed by CONSULTANT to provide structural design services. In this <br />phase the approved TS&L phase bridge structure will be advanced to full design level and <br />preparation of Plans, Specifications and Estimate (PS&E) for construction purposes. <br />All structural design shall be per current WSDOT, AASHTO LRFD standards and City of <br />Everett standards. WSDOT design standards shall control over AASHTO. <br />Based on the AGENCY’s chosen alternative from the TS&L phase, the design team will prepare <br />30%, 60%, 90%, and 100% PS&E packages. Specification Manual will be provided at the 60%, <br />90%, and 100% PS&E packages. <br />11.1 30% P&E - This task encompasses all the activities associated with the preparation of <br />the 30% Plans and Engineer’s opinion of construction cost Estimate (P&E) documents. <br />Constructability Review and QA/QC activities are an inherent part of this task. <br />Deliverables: <br /> PDF 11”x17” (half size) copy of Plans. <br />PDF copy of the quantity Estimates and opinion of cost Estimate. <br />11.2 60% PS&E - This work element item encompasses all the activities associated with the <br />preparation of the 60% Plans and engineer’s opinion of construction cost Estimate (P&E) <br />documents. All Agency comments from the 30% design will be responded to and <br />incorporated. Constructability Review and QA/QC activities are an inherent part of this <br />element. <br />Deliverables: <br /> PDF 11”x17” (half size) copy of Plans. <br /> PDF copy of the quantity Estimates and opinion of construction cost. <br /> PDF copy of the preliminary Specifications. <br />11.3 90% PS&E - This task encompasses all the activities associated with the preparation of <br />the 90% Plans, Special Provisions and engineer’s opinion of construction cost Estimate <br />(PS&E). All Agency comments from the 60% design will be responded to and <br />incorporated. Constructability Review and QA/QC activities are an inherent part of this <br />element. <br />Deliverables: <br /> PDF 11”x17” (half size) copy of Plans. <br /> PDF copy of the 90% Specifications Manual. <br /> PDF copy of the quantity Estimates and opinion of construction cost. <br />11.4 100% Plans, Specifications & Estimate (PS&E) - This task encompasses all the <br />activities associated with the preparation of the 100% Plans, Special Provisions and <br />engineer’s opinion of construction cost Estimate (PS&E). All Agency comments from
The URL can be used to link to this page
Your browser does not support the video tag.