Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br />Page 38 of 43 <br />WORK ELEMENT 12 CONSTRUCTABILITY, SCHEDULE AND COST <br />ESTIMATE <br />This work element is performed by Ott-Sakai & Associates (Ott-Sakai) to provide <br />constructability review and construction estimation services. This work element includes the <br />following tasks: <br />12.1 Project Management <br />1.Invoicing <br />2.Team Management and Coordination <br />3.Meetings <br />12.2 Construction and Cost Estimate <br />Providing constructability review, cost estimation, and a construction schedule on the <br />30%, 60%, 90% and Draft 100% PS&E level. <br />Constructability review <br />Cost Estimate <br />Construction Schedule <br />Deliverables: <br />Constructability review report, cost estimate, and construction schedule