Laserfiche WebLink
•Early settlement of Lowell <br />•The Milwaukee Road rail line <br />•The story of the pilings <br />Ecological Topics <br />•highlight on site species of interest ex. Amphibians or birds and describe something <br />interesting about lifecycle, migration & movement, and. – avoid duplicating content <br />of other signage along the trail or WSDOT <br />•Elevation illustration: The special canopy of wetlands <br />•Mammals <br />•Flora and fauna <br />•Wetland habitats <br />•how visitors can make a positive impact at the park or at home <br />Timeline <br />Phase Duration <br />Research, writing, and material acquisition ~4 months <br />Graphic design and layout ~1 month <br />Editing and revisions ~2 weeks <br />Total estimated project duration: 5.5 months <br />Budget <br />Total Design Cost: $8,000 <br />Task Cost <br />Research, writing, and material acquisition <br />120 hours @ $50 = $6,000 <br />Graphic design and layout 20 hours @ $80 = $1,600 <br />Editing (incl. 2 rounds of revision) 5 hours @ $80 = $400