My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix, Inc. 6/22/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Parametrix, Inc. 6/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2026 3:26:37 PM
Creation date
6/24/2026 3:25:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix, Inc.
Approval Date
6/22/2026
Council Approval Date
6/17/2026
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
I-5/US-2 Interim Improvements – Design
Tracking Number
0005279
Total Compensation
$942,676.24
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Scope of Work <br />US 2 Trestle Interim Improvements 13 April 2026 <br />Deliverables <br />Deliverables for this subtask include: <br /> Strategy for delivery of up to two design packages for construction <br />Task 05 – Stormwater <br />Subtask 05-01 – Conceptual Stormwater Analysis <br />The Consultant shall perform the following: <br /> Analyze roadway concepts to determine the level of stormwater conveyance, detention and <br />treatment needed for the project. These results will be used to scope the level of effort <br />needed for the hydraulic report and final stormwater design. <br /> Define sub-basins and determine existing and proposed PGIS for each design package <br /> Conceptual conveyance design feasibility for proposed roadway improvements. This shall <br />include confirmation of discharge points and using available WSDOT tools and other means <br />for stormwater design documentation, inlet spacing, and approximate pipe sizing by rational <br />method and Manning’s equation. <br /> Propose stormwater detention and treatment BMPs for each sub-basin <br />The above work shall be compiled into a Conceptual Stormwater Memorandum. The <br />memorandum shall also describe the approach for the final hydraulic design work, including a <br />recommendation of the appropriate WSDOT hydraulic report type. <br />Assumptions <br />Assumptions for this task include: <br /> City of Everett and WSDOT will provide review and comment <br /> Will follow City of Everett and WSDOT stormwater design guidelines as applicable <br /> Does not include the hydraulic report (future phase of work) <br />Deliverables <br />Deliverables for this subtask include: <br /> Conceptual Stormwater Memorandum – draft for City review <br /> Conceptual Stormwater Memorandum – draft for WSDOT review <br /> Conceptual Stormwater Memorandum – final <br />Task 06 – Outreach <br />The Consultant will support the City in preparing outreach material, including electronic and website <br />updates. This includes preparing graphics, material and documentation for public and City Council <br />information.
The URL can be used to link to this page
Your browser does not support the video tag.