My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Norton Corrosion Limited, LLC 7/5/2026 Amendment 1
>
Contracts
>
Agreement
>
On-Call (not construction)
>
Norton Corrosion Limited, LLC 7/5/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2026 11:52:00 AM
Creation date
7/7/2026 11:51:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Norton Corrosion Limited, LLC
Approval Date
7/5/2026
Council Approval Date
7/1/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
On-call Corrosion Control Services
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0005099
Total Compensation
$170,000.00
Contract Type
Agreement
Contract Subtype
On-Call (not construction)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Norton Corrosion Limited, LLC 2/2/2026
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\On-Call (not construction)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
M Norton Corrosion Limited, LLc <br />Since 1959 <br />Item Quantitv <br />April16,2026 <br />Ms. Heather Griffin, PE <br />City of Everett <br />2930 Wetmore Avenue, 3rd Floor <br />Everett, WA 98201 <br />E: HGriffi n@everettwa. gov <br />p 425.257.7206 <br />Subject:CATHODIC PROTECTION ENGINEERING SERVICES <br />BUIRED METALLIC PIPING (SHORE AVE AREA) <br />EVERETT, WASHINGTON <br />Dear Heather: <br />Norton Corrosion Limited (NCL) is pleased to provide this budget to evaluate the cathodic protection (CP) <br />systems protecting the subject buried metallic water pipelines. This budget is based on your email <br />communications with NCL's Eric Shadle and a meeting at your office in March. <br />We understand the city would like to upgrade the CP systems on Shore Avenue and Lift Station L In order <br />to start this task, we need to evaluate the current condition of the CP systems. The following are the general <br />tasks we would anticipate for this project effort: <br />1. General CP testing and troubleshooting of both systems: We estimate up to two days in the field <br />for this effort based for single NCL engineer. If it ends up being less, we will bill accordingly. <br />2. Depolarization Survey: This is a survey that would be completed approximately 30-60 days after <br />the general CP survey. At the end of the first survey, NCL would turn the system off to allow it to <br />depolarize. Testing data from this survey is important for future upgrade designs. We estimate one <br />day for single NCL person in the field for this effort. <br />3. Continuity Testing: Based on information gained in our meetings, there is a concern that a portion <br />of the piping may not be electrical continuous. This will be important to verifli for any future CP <br />upgrade plans. If this testing is recommended after the general CP survey, it could be completed <br />afterthe general survey and before the depolarization survey. We estimate up to one day in the field <br />for this effort based on two person NCL team. If it ends up being less (or single person is able to <br />complete it, we will bill accordingly-we will know what is required after the initial testing). <br />4. CP Engineering/Design CP Upgrades: NCL will complete bid ready CP CAD plans and <br />specifications. At this time, we base this effort on a two-step design submittal. If additional steps <br />are needed, NCL can accommodate at an additional cost. Budget is also based on completing the <br />design for both systems at the same time. <br />5. At this time, we have not included post design bid/construction support. Once we have a better <br />understanding of how this project will evolve, we would be happy to provide that. This effort could <br />include answering CP bid related questions/RFls, review CP submittals, attend a CP installation <br />kickoff meeting, review installation progress, test or witness the post installation testing. <br />8820 222nd Street SE, Woodinville, WA 98077 <br />Phone (425) 483-1616 <br />Email: pgoodwin@nortoncorrosion.com <br />www. nortoncorrosion.com <br />Description Rate Ext. Rate <br />1 <br />2 <br />J <br />4 hrs <br />I lot <br />I lot <br />Proj ect Setup/Review proj ect documents (drawings/reports etc.) <br />General CP Survey (two days on the field) <br />Depolarization Survey (one day on the field) <br />$2s3.00 <br />$4,950.00 <br />$2,480.00 <br />$1,012.00 <br />$4,950.00 <br />$2,480.00
The URL can be used to link to this page
Your browser does not support the video tag.