Laserfiche WebLink
NORTON CORROSION LIMITED <br />CITy oF EvERETT SHoRrr-rNe PnopEnrv <br />App.u16,2026 <br />PAGE 2 oF 2 <br />4 <br />5 <br />6 <br />1 lot <br />I lot <br />4 hrs <br />Continuity Testing (one dayltwo person team in the field) <br />Detailed Written Report on Survey: NCL will write a detailed report with <br />raw data collected, our observations, conclusions and any recommendations <br />Post Report Phone/Online Meetings/Follow up <br />Total Pre-Design Effort Budget <br />CP Design <br />$3,995.00 <br />$4,554.00 <br />$3,995.00 <br />$4,554.00 <br />$253.00 $1,012.00 <br />$18,003.00 <br />Design & Specifications l't Submittal - 50"h <br />7 <br />8 <br />9 <br />l0 <br />1l <br />t2 <br />l3 <br />14 <br />1 <br />2 <br />6 <br />18 <br />10 <br />t6 <br />2 <br />I <br />hrs Prepare Basis of Design <br />hrs Prepare Calculations <br />hrs Prepare Cost Estimate <br />hrs Prepare CP Specification <br />hrs Prepare Supporting Design Drawings (by Engineer) <br />hrs CAD Drawings <br />hrs Secretarial Support <br />hrs Principal Review <br />l't Submittal - Estimated Budget <br />$2s3.00 <br />$2s3.00 <br />$213.00 <br />$24s.00 <br />$245.00 <br />$ l3 s.00 <br />$99.00 <br />$2s3.00 <br />$s06.00 <br />$s06.00 <br />$1,278.00 <br />$4,410.00 <br />$2,450.00 <br />$2,160.00 <br />$198.00 <br />$2s3.00 <br />$ I 1,761 .00 <br />l5 <br />l6 <br />17 <br />18 <br />t9 <br />20 <br />2l <br />22 <br />23 <br />24 <br />Design & Specifications 2od Submittal - Final <br />50% Submittal Revision Review, Phone Meeting & Follow up <br />Update Basis of Design <br />Update Calculations <br />Update the Cost Estimate <br />Update CP Specification <br />Update Supporting Design Drawings (by Engineer) <br />CAD Drawings <br />Secretarial Support <br />Principal Review <br />Final Design Review Meeting with project stakeholders. Budget includes <br />up to four hours for meeting and includes meeting prep. <br />2nd Submittal - Estimated Budget <br />25 4 hrs Post Design Follow up meetings <br />1 <br />2 hrs <br />0 hrs <br />I hrs <br />2 hrs <br />2 hrs <br />4 hrs <br />8 hrs <br />t hrs <br />t hrs <br />I lot <br />$2s3.00 <br />$2s3.00 <br />$2s3.00 <br />$213.00 <br />$24s.00 <br />$24s.00 <br />$13s.00 <br />$99.00 <br />$2s3.00 <br />$1,518.00 <br />$2s3.00 <br />$s06.00 <br />$2s3.00 <br />$426.00 <br />$2,940.00 <br />$980.00 <br />$1,080.00 <br />$99.00 <br />$253.00 <br />$1,518.00 <br />$8,055.00 <br />$1,012.00 <br />Total Estimated Design Budeet $20,828.00 <br />Terms: Net 30 days on approved credit. Validity of proposal 30 days. NCL maintains $3NI/$5M <br />professional liability insurance. Additional coverage is available at added cost. Your returned authorization <br />(below) or email can serve as our Notice to Proceed. Thank you for the opportunity to provide a proposal <br />for this project. We look forward to your positive response. <br />/,?cererv'\lr-, <br />Philip Goodwin <br />Technical Marketing <br />(7) SC\PBC\Everett_Shorel ineproperty <br />Authorized By