My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gray and Osborne 6/29/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
Gray and Osborne 6/29/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 10:46:08 AM
Creation date
7/6/2016 10:45:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Gray and Osborne
Approval Date
6/29/2016
Council Approval Date
6/15/2016
End Date
3/13/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WFP Standpipe Replacement
Tracking Number
0000157
Total Compensation
$191,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF SERVICES <br /> CITY OF EVERETT <br /> WATER FILTRATION PLANT RESERVOIR 2 <br /> PROJECT UNDERSTANDING <br /> The City of Everett(City) seeks engineering services for a predesign report and design of <br /> a new reservoir to supply the Water Filtration Plant(Plant) at Lake Chaplain with potable <br /> water storage for plant processes, drinking water, and fire suppression. The existing <br /> reservoir was constructed in the late 1960s,has an existing coating system with a lead- <br /> based primer, and is likely seismically deficient. Given the limited capacity and the costs <br /> to rehabilitate the existing reservoir, the City desires to construct a new, larger reservoir <br /> and water main to connect it to the Plant. It is anticipated that this reservoir will be <br /> 400,000 to 1,000,000 gallons in capacity. <br /> This project will be undertaken in two phases. Phase 1 will be a pre-design report that <br /> will provide the options available to the City with regard to reservoir location, size, and <br /> materials; water main location; and preliminary costs. Phase 2 will be the design of the <br /> selected option from Phase 1. <br /> Notice to Proceed, Phase 1: April 2016 <br /> Final Predesign Report: July 2016 <br /> Notice to Proceed, Phase 2: August 2016 <br /> 60 Percent Design Submittal: November 2016 <br /> 90 Percent Design Submittal: February 2017 <br /> Final Design Submittal: April 2017 <br /> Bid: May 2017 <br /> Award: June 2017 <br /> Construction of the Reservoir: July—December 2017 <br /> SCOPE OF WORK <br /> Gray& Osborne will perform the following tasks. <br /> G&O#20164.87 Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.