My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gray and Osborne 6/29/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
Gray and Osborne 6/29/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 10:46:08 AM
Creation date
7/6/2016 10:45:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Gray and Osborne
Approval Date
6/29/2016
Council Approval Date
6/15/2016
End Date
3/13/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WFP Standpipe Replacement
Tracking Number
0000157
Total Compensation
$191,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Prepare contract addenda, as necessary. <br /> 4. Perform Submittal review. <br /> Deliverables: <br /> Download ready document set prepared for upload to Builders Exchange or similar <br /> service; copies of submittals that are reviewed. <br /> Assumptions: <br /> Submittals assume one resubmittal for each submittal. <br /> Task 10—Construction Management Support <br /> Objective: Assist the City in reviewing submittals provided by the Contractor. <br /> Deliverables: <br /> Copies of submittals that are reviewed. <br /> Assumptions: <br /> Submittals assume one resubmittal for each submittal. <br /> Task 11—Additional Services as Approved by the Owner <br /> Objective: To provide services which are not listed within this Scope of Work that are <br /> directed by the City. The Work will be performed by the Gray and Osborne staff at their <br /> listed billing rate, as required by the request of the City. The budget amount provided <br /> under Task 11 shall be a not-to-exceed amount. <br /> Not included within this Scope of Work are the following: <br /> 1. Boundary survey or easements. <br /> 2. Construction management including progress estimate preparation, <br /> responding to RFIs, or change order preparation or negotiation. <br /> 3. Field construction inspection. <br /> G&O#20164.87 Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.