My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 2 Thomco Construction
>
Contracts
>
Capital Contract
>
Change Order 2 Thomco Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 11:18:25 AM
Creation date
7/6/2016 11:18:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
6/29/2016
Council Approval Date
6/15/2016
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Shore Ave Storm Water Outfall Project
Public Works WO Number
3118
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Total Compensation
$180,238.04
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Shore Avenue Storm Water Outfall Improvements Project <br /> Change Order No.2 <br /> Change Order Effective Date: May 11, 2016 <br /> CONTRACTOR <br /> *43 4104.4)14e,- <br /> By (14f <br /> V 1� Date: 5/'2 7A, <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> Change Order#2 modifies three(3) existing bid items to Schedule A, modifies twelve (12) existing bid <br /> items and adds five (5)new items to Schedule B of the contract as follows: <br /> Modified bid items under schedule A are as follows: <br /> Modify existing bid item #13 titled, "HMA Class 1/2-inch PG 64-22," by deleting 80 tons of HMA <br /> Class 1/2-inch PG 64-22, at the unit contract price of$131.00 per ton,resulting in a$10,480.00 decrease <br /> to the contract price. <br /> Modify existing bid item#14 titled, "Planing Bituminous Pavement," by deleting 510.00 square <br /> yards of planing bituminous pavement, at the unit price of$9.50 per square yard, resulting in a <br /> $4,845.00 decrease to the contract price. <br /> Modify existing bid item #15 titled, "Temporary Pavement Patch," by deleting 220 square yards of <br /> Temporary Pavement Patch, at the unit price of$50.00 per square yard, resulting in an $11,000.00 <br /> decrease to the contract price. <br /> Modifications made to the three (3)bid items above results in a $26,325.00 contract price decrease to <br /> schedule A. <br /> Modified bid items under schedule B are as follows: <br /> Modify existing bid item #53 titled, "Force Account," by deducting$15,000.00 from the dollar <br /> amount anticipated for this bid item. <br /> Modify existing bid item #54 titled, "Traffic Control Labor," by adding an additional 320 hours of <br /> Traffic Control Labor, at the unit price of$53.00 per hour, resulting in a$16,960.00 contract price <br /> increase. <br /> Modify existing bid item#56 titled, "Sawcutting Pavement,Final Joint Cut, Up to 6-inch Thick," <br /> by deleting 2,200 linear feet of sawcutting pavement, final joint cut, up to 6-inch thick, at the unit price <br /> of$7.75 per linear foot, resulting in a$17,050.00 deduct from the contract amount. <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.