Laserfiche WebLink
Exhibit A-2 <br /> Scope of Work <br /> PSO6 Reroute Project <br /> Task 12-13 Construction Phase Services <br /> Objective <br /> 1. To assist the City with construction phase services. <br /> Reid Middleton: Structural Construction Phase Services <br /> 1. Conduct (6) site visits during the construction phase of the project to observe the <br /> construction of structural aspects of the project. The anticipated site visits are expected <br /> to occur during the installation of tiebacks, installation of piles, installation of concrete <br /> pile cap, installation of steel waler system and two visits at a yet to be determined time. <br /> 2. Provide structural review of shop drawings and deferred submittals relating to the <br /> structural design of the project. <br /> 3. Review contractor request for information pertaining to the structural design of the <br /> project. <br /> 4. Attend (6) on site construction meetings. <br /> 5. Attend pre-construction meeting. <br /> 6. Coordination with the City and the Port, internal project management. <br /> Reid Middleton: Civil Construction Phase Services <br /> 1. Attend pre-construction meeting. <br /> 2. Review civil submittals, products, and shop drawings requested in the technical <br /> specifications. <br /> 3. Answer contractor questions (e.g. RFIs, Field Questions) concerning civil design. <br /> 4. Attend (2) on site construction meetings. <br /> 5. Conduct up to (6) site visits during construction to observe aspects related to the civil <br /> design of the project, as requested by the City. <br /> 6. Provide internal project management and administration. <br /> 7. Perform a substantial completion walk-through and review a punch list for elements of <br /> civil design prepared by the City. <br />