My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment 2 Reid Middleton
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Amendment 2 Reid Middleton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 11:38:24 AM
Creation date
7/6/2016 11:38:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton, Inc.
Approval Date
6/29/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall No. 6 Reroute
Public Works WO Number
UP 3583
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$64,017.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shannon and Wilson Construction Phase Services <br /> 1. Contractor Submittal Review <br /> a. Pipe Pile Submittal <br /> b. Tieback Submittal <br /> c. Dewatering Submittal <br /> 2. Geotechnical/Environmental Construction Observation <br /> a. Preconstruction Meeting <br /> b. Observation of Mass Excavation, Subgrade Observation, and Environmental <br /> Screening (assumed 1 week of excavation observation@10 hours per day <br /> including travel time and report preparation) <br /> c. Tieback Installation (assumed 1 week@10 hours per day including travel time <br /> and report preparation) <br /> d. Tieback Testing (assumed 1 hour per proof test, 2 hours per performance test, <br /> and 1 hour for test interpretation and report preparation) <br /> e. Pipe Pile Driving Criteria (WEAP Analysis) <br /> f. Pipe Pile Installation (assumed 1 day@10 hours including travel time and report <br /> preparation) <br /> g. Placement and Compaction of Backfill (assumed 1 week @10 hours per day <br /> including travel time and report preparation) <br /> 3. Office Review, Supervision and Consulting Services <br /> a. Field Activity Report Review <br /> b. Environmental Testing /Analytical Results Review <br /> c. Groundwater Monitoring Review <br /> d. Additional Project Meetings (assumed conference calls) <br /> e. Site Visits— Review of Unanticipated Conditions <br />
The URL can be used to link to this page
Your browser does not support the video tag.