Laserfiche WebLink
Shannon and Wilson Construction Phase Services <br /> 1. Contractor Submittal Review <br /> a. Pipe Pile Submittal <br /> b. Tieback Submittal <br /> c. Dewatering Submittal <br /> 2. Geotechnical/Environmental Construction Observation <br /> a. Preconstruction Meeting <br /> b. Observation of Mass Excavation, Subgrade Observation, and Environmental <br /> Screening (assumed 1 week of excavation observation@10 hours per day <br /> including travel time and report preparation) <br /> c. Tieback Installation (assumed 1 week@10 hours per day including travel time <br /> and report preparation) <br /> d. Tieback Testing (assumed 1 hour per proof test, 2 hours per performance test, <br /> and 1 hour for test interpretation and report preparation) <br /> e. Pipe Pile Driving Criteria (WEAP Analysis) <br /> f. Pipe Pile Installation (assumed 1 day@10 hours including travel time and report <br /> preparation) <br /> g. Placement and Compaction of Backfill (assumed 1 week @10 hours per day <br /> including travel time and report preparation) <br /> 3. Office Review, Supervision and Consulting Services <br /> a. Field Activity Report Review <br /> b. Environmental Testing /Analytical Results Review <br /> c. Groundwater Monitoring Review <br /> d. Additional Project Meetings (assumed conference calls) <br /> e. Site Visits— Review of Unanticipated Conditions <br />