My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment 2 Reid Middleton
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Amendment 2 Reid Middleton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 11:38:24 AM
Creation date
7/6/2016 11:38:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton, Inc.
Approval Date
6/29/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall No. 6 Reroute
Public Works WO Number
UP 3583
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$64,017.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Corbin Hammer, PE, SE SHANNON Fi\NILSON,INC. <br /> Reid Middleton, Inc. <br /> June 1, 2016 <br /> Page 2 of 5 <br /> • Preconstruction meetings with design team; <br /> • Observation of mass excavation; <br /> • Screen material for reuse as backfill; <br /> • Environmental screening, as required; <br /> • Installation and testing of tiebacks; <br /> • Observation and evaluation of manhole and pipe subgrades; <br /> • Installation of 12-inch-diameter pipe piles; and <br /> • Placement and compaction of backfill. <br /> Our services will be provided on a full-time,part-time, or on-call basis depending on the <br /> activities underway and the schedule of the Contractor. We will rely on the Contractor to inform <br /> us of the times that we are needed at the project site. At least 24 hours' advance notice is <br /> requested for our services during an on-call basis. During mass excavation, installation and <br /> testing of the tiebacks, and installation of the pile foundation elements,we will have a <br /> representative on site,full-time. Our services for the remaining tasks will be either part-time or <br /> on-call, as required by the construction schedule. <br /> After each site visit, our field representative will prepare daily field activity reports of observed <br /> construction activities and tests. Copies of our reports will be sent electronically to the City of <br /> Everett, The General Contractor, and RMI. Please let us know if additional circulation copies <br /> are required. <br /> While at the project site, our field representative will advise the City and Contractor of our <br /> observations and opinions. Recommendations that may affect the contract costs will be made to <br /> the owner. Our field representative will not instruct or direct the Contractor, as his direction <br /> should be received from the owner or others responsible for contract administration. We will <br /> contact you directly if immediate action needs to be taken. Our duties do not include a review of <br /> or responsibility for the adequacy of safety measures at or near the project site. <br /> Environmental Screening <br /> Based on the laboratory analytical results and field observations of the soil samples collected at <br /> the site along the proposed utility corridor,the majority of the soil appears to not be <br /> contaminated. However, soil represented by one of the composite samples, GP-1-7.5C, is <br /> impacted by heavy oil-range hydrocarbons. At a minimum,we recommend that environmental <br /> screening of the excavated material occur near the location of boring GP-1. We assume that our <br /> 21-2-62768-001-L1-Rev/wp/kn 21-2-62768-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.