My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment 2 Reid Middleton
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Amendment 2 Reid Middleton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 11:38:24 AM
Creation date
7/6/2016 11:38:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton, Inc.
Approval Date
6/29/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall No. 6 Reroute
Public Works WO Number
UP 3583
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$64,017.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-IIP SHANNON &WILSON, INC. ALASKA <br /> GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS FLORIDA <br /> MISSOURI <br /> OREGON <br /> WASHINGTON <br /> WASHINGTON DC METRO <br /> WISCONSIN <br /> June 1,2016 <br /> Mr. Corbin Hammer,PE, SE <br /> Reid Middleton,Inc. <br /> 728 134th Street SW, Suite 200 <br /> Everett, WA 98204 <br /> RE: PROPOSAL FOR GEOTECHNICAL/ENVIRONMENTAL CONSTRUCTION <br /> OBSERVATION SERVICES,PORT OF EVERETT PSO 6 REROUTE, <br /> EVERETT,WASHINGTON <br /> Dear Mr. Hammer: <br /> We are pleased with the opportunity to submit this proposal for geotechnical/environmental <br /> construction observation services at the Port of Everett property corresponding to the PSO 6 <br /> Re-route in Everett, Washington. This proposal is based on the 95 percent design plans <br /> submitted to us by Reid Middleton, Inc. (RMI)and our experience with similar projects in the <br /> area. <br /> SCOPE OF SERVICES <br /> Submittal Review <br /> Prior to observing the construction activities for this project,we will provide review of <br /> Contractor submittals corresponding to the following: <br /> • Tiebacks, <br /> • Pipe Piles, and <br /> • Dewatering. <br /> Construction Observation <br /> For this project,we will assign experienced field staff to observe that the following <br /> geotechnical/environmental construction activities are accomplished in accordance with the <br /> project plans and specifications: <br /> 400 NORTH 34TH STREET,SUITE 100 <br /> P.O.BOX 300303 <br /> SEATTLE,WASHINGTON 98103-8636 <br /> 206-632-8200 FAX: 206-695-6777 <br /> www.shannonwilson.com 21-2-62768-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.