Laserfiche WebLink
EXHIBIT A <br /> TRANSPORTATION ELEMENT (Addition to text of Comprehensive Plan) <br /> House Bill 1487, adopted by the State Legislature in 1998, requires that cities add a sub- <br /> element to their comprehensive plans related to State owned transportation facilities, and <br /> transportation facilities of statewide significance (even if not owned by the State). <br /> Specific revisions to the Transportation Element to be addressed herein are: <br /> • An inventory of state-owned facilities within Everett's Planning Area. <br /> • Estimate of traffic impacts to state-owned transportation facilities resulting from land <br /> use decisions so performance can be monitored and improvements can be planned. <br /> • Documenting level of service standards for measuring state facility performance. <br /> • Identifying current and future state facility needs that are consistent with the <br /> statewide multi-modal transportation plan. <br /> A. Inventory of State owned facilities. The following are the State owned facilities <br /> located within the Everett Planning Area. Those designated HSS are Highways of <br /> Statewide Significance, as determined by the State. <br /> 1. SR 2 (HSS) from ARM 0.00 to 0.31 (Urban Principal Arterial)-length 0.31 mi. <br /> 2. Interstate 5 (HSS) from ARM 186.48 to 196.05 (Urban Interstate)-length 9.57 <br /> mi. <br /> 3. SR 99 (Non-HSS) from ARM 46.87 to 51.67 (Urban Other Principal Arterial)- <br /> length 4.80 mi. <br /> 4. SR 526 (HSS) from ARM 0.91 to 4.52 (Urban Principal Arterial)-length 3.61 <br /> mi. <br /> 5. SR 527 (Non-HSS) from ARM 9.47 to 11.92 (Urban Principal Arterial)-length <br /> 2.45 mi. <br /> 6. SR 529 (HSS to Port,Non-HSS remainder) from ARM 0.00 to 6.71 (Urban <br /> Other Principal Arterial)-length 6.71 mi. <br /> 7. SR 529 (spur) (HSS)from ARM 0.00 to 0.20 (Urban Other Principal Arterial)- <br /> length 0.20 mi. <br /> 8. SR 96 (Non-HSS)from ARM 0.00 to 4.70 (Urban Principal Arterial)-length <br /> 4.70 mi. <br /> 9. SR 525 (HSS) from ARM 2.43 to 3.53 (Urban Principal Arterial)-length 1.10 <br /> mi. (The portion of SR 525 located within the City of Mukilteo, while abutting <br /> the designated Everett Planning Area, is not included in Everett's inventory.) <br />