Laserfiche WebLink
2 <br /> Task 9—Final Design Services <br /> This task will involve final engineering design services for the Legion Golf Course <br /> Stormwater Detention project. Anticipated elements of this task will include: <br /> 9.1 Golf Course Concept Plan-Develop conceptual plans for the golf course <br /> improvements associated with the project. iConGolf Studio will develop an <br /> understanding of the project,analyze the overall course and develop design strategies <br /> in accordance with Task 1 of their scope of work attached. Key elements of Task 1 <br /> include: <br /> • Up to three design coordination meetings/workshops,including a kickoff <br /> meeting <br /> • Review site conditions and existing information <br /> • Develop alternatives and prepare up to three concept plans <br /> • Review concept plans with team and revise preferred concept plan <br /> 9.2 Golf Course Improvements Schematic Design—The design concept developed in <br /> Subtask 9.1 will be incorporated into the overall project for review. iConGolf will <br /> perform the work in accordance with Task 2 of their scope of work which includes the <br /> following key elements: <br /> • Prepare one final schematic level design plan of the golf course improvements <br /> • Recommend improvements to maintain water quality <br /> • Assist in defining drainage improvements <br /> • Define a strategy to maintain play during construction <br /> • Prepare preliminary construction budget <br /> • Review schematic design with team <br /> 9.3 Prepare 60%Plans,Specifications and Estimate(PS&E)Submittal—MSA will <br /> prepare project plans,specifications and estimate to a 60%level of design completion <br /> based on improvements. Project plans, standard details and specifications will be <br /> prepared in City's format. The following provides a general overview of the proposed <br /> PS&E components that the City will receive and compile into a complete package for <br /> review by the City and MSA: <br /> Plans—Detailed design drawings will be developed for the proposed improvements <br /> and meet City of Everett CAD standards. A preliminary list of drawings that are <br /> anticipated to be included in the final design PS&E are attached. In general,29 plan <br /> sheets are anticipated and will include the following: <br /> • Detention Ponds—Detention pond plans,cross-sections and details. <br /> • Golf Course Improvements—Golf course plans,clearing and grading plans, <br /> cross-sections and details. <br /> • Storm Drainage—Plan,profile and details for storm drainage improvements <br /> within the Golf Course. <br /> • <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC.Legion Golf Course Sw Detention <br /> June 2016 Engineers/lumen Page 4 • <br />