My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/07/06 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/07/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2016 9:01:55 AM
Creation date
7/13/2016 9:00:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> In general,plans will be developed using a one-inch equals 20 feet horizontal <br /> scale,however different scales may be used if necessary for clarity. <br /> Specifications-Prepare specifications consisting of bidding and contract documents, <br /> standard details,technical specifications and appendices. Specifications will be <br /> prepared in WSDOT APWA standard format for all utility and roadway work. <br /> Specifications for the specialty golf course improvements will be prepared in CSI <br /> MasterFormat in a separate section. The specifications are anticipated to include the <br /> following components that will be incorporated in a project manual by the City. <br /> • Bid Proposals for Legion Golf Course Stormwater Detention Project <br /> • Special Provisions and Technical Specifications for Legion Golf Course <br /> Stormwater Detention Project <br /> Estimate—MSA will prepare an engineer's opinion of probable construction cost <br /> estimate based upon the 60%design that includes an appropriate contingency for the <br /> level of design completion. <br /> 9.4 60%Review& Workshop—The City will prepare a complete 60%PS&E package to <br /> include City's prepared N. Wetmore Stormwater Separation design and MSA's <br /> Stormwater Detention and Golf Course plans. MSA will review the complete 60% <br /> PS&E package and a workshop will be conducted with the City to review the complete <br /> 60%PS&E package and collaborate on work required to prepare the 90% deliverable. <br /> The 90%plans and specifications will be revised based on review comments and <br /> discussions with City. Written responses to review comments will be prepared and <br /> submitted in a timely manner. <br /> 9.5 Prepare 90%PS&E Submittal-Following the 60%Review Workshop,MSA will <br /> prepare PS&E submittal to a 90%level of design completion incorporating agreed <br /> review comments. MSA will prepare an engineer's opinion of probable construction <br /> cost estimate based upon the 90%design that includes an appropriate contingency. <br /> 9.6 90% & Workshop—The City will prepare a complete 90%PS&E package to include <br /> City's prepared N. Wetmore Stormwater Separation design and MSA's Stormwater <br /> Detention and Golf Course plans. MSA will review the complete 90%PS&E package <br /> • and a workshop will be conducted with the City to review the complete 90%PS&E <br /> package and collaborate on work required to prepare the 100%deliverable. The 100% <br /> plans and specifications will be revised based on review comments and discussions <br /> with City. Written responses to review comments will be prepared and submitted in a <br /> timely manner.. - <br /> 9.7 Prepare Final Bid PS&E(100%)—Following the 90%Review Workshop,MSA will <br /> prepare final bid-ready plans and specifications incorporating agreed review comments. <br /> • <br /> City of Everett MURRAY,SMIT ASSOCIATES,INC.Legion Golf Course SW Detention <br /> June 2016 Engineers nners Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.