My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/07/06 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/07/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2016 9:01:55 AM
Creation date
7/13/2016 9:00:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement for Murray,Smith and Associates <br /> Everett,WA <br /> May 12,2016 <br /> ■ Golf hole improvements <br /> • Golf hole strategies, playability and aesthetics <br /> ■ Driving Range/Practice areas <br /> ■ Circulation &safety <br /> o Other impacted golf features <br /> 6. Prepare up to three(3) concept plans or diagrams with associated preliminary budgets <br /> for the Project area based on the site visit and the City's programming and design <br /> criteria. <br /> 7. Present concept plan(s)via conference call to City and Consultant's project team for <br /> review, comments and approvals. <br /> _ 8. Revise preferred concept plan based on Consultant and City's comments. <br /> 9. Based on the Consultant's and City's comments and instructions, select one final concept <br /> plan to establish the Project's goals and budget. <br /> 10. Prepare a detailed project schedule/work plan. <br /> Deliverables <br /> 1. Summary of project goals and desired outcomes, including the City's critical success <br /> factors. <br /> 2. Project schedule/work plan. <br /> 3. Up to three(3) preliminary concept diagrams and preliminary budgets for the Project in <br /> designated work area (Property). <br /> 4. Based on the City approval, a finalized illustrative concept plan of the golf course <br /> highlighting areas of improvement. <br /> Task 2-Schematic Design <br /> Objectives <br /> 1. Advance the design concepts prepared in Task 1 and integrate the City approved <br /> Concept Plan with the design concepts produced by Consultant in the Pre-Design and <br /> under direction of Gary Sayre and Consultant. Identify options or alternatives, evaluate <br /> them and recommend a course of action. <br /> 2. Provide opportunity for input from Premier Golf Centers (PGC). <br /> 3. Recommended priorities and strategies for implementation of remodel work. <br /> Tasks <br /> 1. Based on City approved Concept Plan, prepare one(1) final schematic level design plan <br /> that clearly illustrates the golf course improvements, key relationships, site circulation and <br /> the relative disposition of the storm water ponds to the golf course: <br /> o Golf course hole routing <br /> o Golf course feature revisions <br /> o Golf course strategy <br /> o Golf course circulation (cart path alignment) <br /> o Overall project area golf course improvements <br /> o Working with Consultant, prepare preliminary pond layouts based on information <br /> and design criteria (active storage volumes, etc.) provided by Consultant. <br /> o Schematic site grading and drainage concepts for the Project. <br /> 2 <br /> 14114 Blue River Trail • Broomfield, CO 80023-3913• 503.799.2682 •tschoeder(a�icongolfstudio.com <br /> htto://www.icciniolfstudio.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.