My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/07/06 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/07/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2016 9:01:55 AM
Creation date
7/13/2016 9:00:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Legion Golf Course Stormwater Detention Project <br /> City of Everett Work Order#UP3620 <br /> EXHIBIT C-1 <br /> Scope of Work <br /> Final Design,Bidding.and Construction Support <br /> Murray, Smith&Associates,Inc. (MSA)has developed the following scope of work and fee <br /> estimate for final design,bidding and construction support services for the Legion Golf <br /> Course Stormwater Detention Project, City of Everett Project#UP3620. The scope and fee <br /> have been developed based on our discussions with City staff,the preliminary design and our <br /> project understanding and proposed approach to the work. The upstream stormwater <br /> collection network tributary to this project is divided into two phases: Phase 1 —N. Wetmore <br /> Ave Stormwater Separation Project and Phase 2—Alverson Blvd Stormwater Separation <br /> Project. It is intended that Phase 1 will be constructed together with this project. <br /> Background <br /> The need for this project is based on the City's 2014 Comprehensive Sewer Plan(CSP) <br /> Update Capital Improvement Plan,in which it is recommended that the City construct a <br /> separate storm water network to effectively mitigate flooding and backup issues in the North <br /> Everett Combined Sewer System. The project area is located in the northwest area of north <br /> Everett,specifically between 10th streets and 3rd Street,Alverson Boulevard and <br /> Wetmore/Rockefeller Avenues, and due west of the Legion Memorial Golf Course and <br /> Everett Community College Campus (EvCC). This project together with the N. Wetmore <br /> and Alverson Stormwater Separation projects will address the following sewer and storm <br /> drainage issues: <br /> • Reduce basement flooding on Alverson, Grand,Rucker,Hoyt, Colby and Wetmore <br /> Avenues between 4th and 10th St., <br /> • Reduce sewer backup/storm water flooding problems at Rainier hall at EvCC <br /> • Improve"level of service"for sewer collection system in overall general area <br /> • Separate storm water drainage and detention facilities <br /> • Reduce wet weather flow rate in C-Basin trunk sewer <br /> • Reduce wet weather flows to siphon headworks and CSO overflows at SRO2 and <br /> SRO3. <br /> The City and HDR(author of the CSP)agree that sanitary sewer upsizing/replacement will <br /> not reliably eliminate the basement flooding problem and that a separate stormwater network <br /> will be more effective. In addition,the City has engaged the City Parks department manager <br /> and the operations managers of Legion Golf Course(Parks) and has discussed the concept of <br /> utilizing water features within the golf course for stormwater detention and increase the <br /> quality of play at the course. <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC.Legion Golf Course SW Detention <br /> June 2016 Engineers ers Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.