Laserfiche WebLink
s <br /> A.,' <br /> MSA was authorized to proceed with the preliminary design phase of the work in August <br /> 2015. Through the preliminary design phase,working closing with City and Parks, a <br /> separate stormwater network in Northwest Everett was defined that will collect stormwater <br /> runoff and utilize existing and new water features within the golf course for detention. <br /> Elements of the project to move into final design,bidding and construction have been <br /> defined and include the following: <br /> • Stormwater conveyance piping connections to the proposed N. Wetmore Separation <br /> Project at two locations, from the public right-of-way to water features within the golf <br /> course <br /> • The expansion of one existing water feature and construction of one new water <br /> feature to be used for stormwater detention <br /> • Hydraulic structures,piping and features to control and convey detained flow to the <br /> existing Basin C trunk sewer <br /> • Golf course improvements to incorporate the water features into the overall layout <br /> and playability of the golf course <br /> • Support efforts to acquire an easement from Everett Community College for the south <br /> connection to the N.Wetmore Separation project. <br /> • Facilitate planning and design to define operation and maintenance parameters for the <br /> shared operation of the ponds by both Public Works and Parks/Golf Course staff. <br /> Key Teaming Partner <br /> With the utilization of water features for detention and the desire to enhance the playability <br /> of the golf course areas impacted by the project,iConGolf Studio, a golf course architecture <br /> firm, is a key teaming partner and has contributed to the development of the scope of work <br /> herein. <br /> Task Descriptions <br /> MSA's proposed scope of work for final design,bidding and construction support services <br /> for the Legion Golf Course Stormwater Detention Project is divided into the following tasks, <br /> which are a continuation of the tasks developed in the preliminary design phase scope of <br /> work. <br /> Final Design,Bidding and Construction Support <br /> Task 8 Project Management (Final Design,Bidding and Construction) <br /> Task 9 Final Design Services <br /> Task 10 • Stakeholder Coordination <br /> Task 11 Permitting <br /> Task 12 Bidding Services <br /> Task 13 Construction Support <br /> Task 14.2 Unanticipated Labor or Expenses <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC.Legion Golf Course SW Detention <br /> June 2016 EngineersfP niers Page 2 <br />