My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8-22.2 Materials <br /> 2 <br /> 3 All plastic marking shall be Type A. <br /> 4 <br /> 5 8-22.3 Construction Requirements <br /> 6 <br /> 7 Pavement markings shall be installed in accordance with Section 8-22.3 of the <br /> 8 Standard Specifications with the following modifications: <br /> 9 <br /> 10 1. All Stop Line shall be 24" wide Type A flat line. <br /> 11 2. All Crosswalk Line shall be solid white lines, 24" wide, installed in accordance <br /> 12 with City of Everett Standard Drawing No. 721 and shall be Type A flat line. <br /> 13 3. All parking lines shall be paint line. <br /> 14 4. All wide line, dotted extension line, arrows, symbols, and letters, shall be Type A <br /> 15 flat line. <br /> 16 <br /> 17 8-22.4 Measurement <br /> 18 <br /> 19 Crosswalk line and stop line will be measured by the linear foot of 24" wide marking <br /> 20 installed. <br /> 21 <br /> 22 <br /> 23 8-22.5 Payment <br /> 24 <br /> 25 Section 8-22 is supplemented read as follows: <br /> 26 <br /> 27 "4-inch Paint Line", per Linear Foot <br /> 28 "4-inch Plastic Line", per Linear Foot <br /> 29 "8-inch Plastic Line", per Linear Foot <br /> 30 "12-inch Plastic Crosswalk Ladder Line", per Linear Foot <br /> 31 "24-inch Plastic Crosswalk Line", per Linear Foot <br /> 32 "24-inch Plastic Stop Line", per Linear Foot <br /> 33 "Plastic Sharrow", per Each <br /> 34 "Plastic Helmeted Bicyclist", per Each <br /> 35 <br /> 36 C-'_O8�i2EF,21.7§1R—EL <br /> 37 8-32 ELECTRONIC FILES <br /> 38 Section 8-32 is new and is supplemented by the following: <br /> 39 <br /> 40 (******) <br /> 41 <br /> 42 When requested by the Contractor, the City will provide an electronic version of the <br /> 43 construction plans (drawings), for use by the Contractor at the Contractor's own risk. In all <br /> 44 cases, the approved paper construction plans are the official contract documents. If the <br /> 45 Contractor wishes to use the electronic version of the construction plans for the purposes of <br /> 46 providing construction surveying of proposed improvements, it shall be the Contractor's <br /> 47 responsibility to verify that any coordinates used from the electronic file exactly match the <br /> 48 station and offset location given in the contract construction plans. Construction plans are <br /> 49 diagrammatic in nature. The coordinate locations of the various graphic elements within the <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021); COE#3540 SP-87 March 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.