Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 recommendations. The manufacturer's recommendations shall be furnished to the <br /> 2 Engineer prior to the start of work and shall include recommended heating time and <br /> 3 temperatures, allowable storage time and temperatures after initial heating, allowable <br /> 4 reheating criteria, and application temperature range. <br /> 5 <br /> 6 Crack sealing with hot poured sealants shall be controlled to confine the material within <br /> 7 the crack or joint. Any overflow of sealant shall be cleaned from the pavement surface. <br /> 8 If, in the opinion of the Engineer, the Contractor's method of sealing the cracks and <br /> 9 joints with hot poured sealant results in an excessive amount of material on the <br /> I 10 pavement surface, the operation shall be stopped and corrected to eliminate the excess <br /> 11 material. <br /> I12 <br /> 13 5-04.3(5)C2 Crack Sealing Areas Prior to Paving <br /> 14 In areas where HMA will be placed the cracks and joints shall be filled with sand slurry. <br /> I15 <br /> 16 5-04.3(5)C3 Crack Sealing Areas Not to be Paved <br /> 17 In areas where HMA will not be placed the cracks and joints shall be filled as follows: <br /> 18 <br /> I19 1. Cracks 1/4 inch to 1 inch in width shall be filled with hot poured sealant. <br /> 20 <br /> 21 2. Cracks and joints greater than 1 inch in width shall be filled with sand slurry. <br /> I22 <br /> 23 5-04.3(5)C4 Crack Sealing Areas Prior to a Bituminous Surface Treatment <br /> 24 In areas where a BST will be placed the cracks and joints shall be filled per Section 5- <br /> I25 04.3(5)C3. <br /> 26 <br /> 27 5-04.4 Measurement <br /> I 28 The following new paragraph is inserted after the third paragraph: <br /> 29 <br /> 30 Crack Sealing-LF will be measured by the linear foot along the line of the crack. <br /> I31 <br /> 32 5-04.5 Payment <br /> 33 The Bid item "Crack Sealing" is revised to read "Crack Sealing-FA". <br /> 34 <br /> 35 The following is inserted after the paragraph following the Bid item "Crack Sealing-FA", by <br /> 36 force account (after the preceding Amendment is applied): <br /> 37 <br /> 1 38 "Crack Sealing-LF", per linear foot. <br /> 39 The unit Contract price per linear foot for"Crack Sealing-LF" shall be full payment for all <br /> 40 costs incurred to perform the Work described in Section 5-04.3(5)C. <br /> I41 <br /> 42 6-02.AP6 <br /> I43 Section 6-02, Concrete Structures <br /> 44 January 4, 2016 <br /> I45 6-02.3(2)A1 Contractor Mix Design for Concrete Class 4000D <br /> 46 The following new sentence is inserted after the second sentence of the last paragraph: <br /> 47 <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 1/4/16 <br />