My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 The secondara ra h is deleted. <br /> p 9 p <br /> 2 <br /> 3 6-19.5 Payment <br /> 4 The paragraph following the bid item "Soil Excavation For Shaft Including Haul", per cubic <br /> 5 yard is revised to read: <br /> 16 <br /> 7 The unit Contract price per cubic yard for "Soil Excavation For Shaft Including Haul" <br /> 8 shall be full pay for performing the work as specified, including all costs in connection <br /> 9 with furnishing, mixing, placing, maintaining, containing, collecting, and disposing of all <br /> I 10 mineral, synthetic, and water slurry, and disposing of groundwater collected by the shaft <br /> 11 excavation, and the incidental excavation of soils between the top of shaft elevation <br /> I 12 shown in the Plans and the existing ground line. <br /> 13 <br /> 14 8-01.AP8 <br /> I15 Section 8-01, Erosion Control and Water Pollution Control <br /> 16 January 4, 2016 <br /> I17 8-01.2 Materials <br /> 18 This section is supplemented with the following new paragraph: <br /> 19 <br /> I20 Recycled concrete, in any form, shall not be used for any Work defined in Section 8-01. <br /> 21 <br /> 22 8-10.AP8 <br /> 23 Section 8-10, Guide Posts <br /> 24 January 4, 2016 <br /> 1 25 8-10.3 Construction Requirements <br /> 26 The last sentence of the second paragraph is deleted. <br /> I27 <br /> 28 8-22.AP8 <br /> I 29 Section 8-22, Pavement Marking <br /> 30 January 4, 2016 <br /> I 31 8-22.4 Measurement <br /> 32 The first two sentences of the fourth paragraph are revised to read: <br /> 33 <br /> I 34 The measurement for "Painted Wide Lane Line", "Plastic Wide Lane Line", "Profiled <br /> 35 Plastic Wide Lane Line", "Painted Barrier Center Line", "Plastic Barrier Center Line", <br /> 36 "Painted Stop Line", "Plastic Stop Line", "Painted Wide Dotted Entry Line", or "Plastic <br /> I37 Wide Dotted Entry Line" will be based on the total length of each painted, plastic or <br /> 38 profiled plastic line installed. No deduction will be made for the unmarked area when <br /> 39 the marking includes a broken line such as, wide broken lane line, drop lane line, wide <br /> 40 dotted lane line or wide dotted entry line. <br /> I 41 <br /> 42 8-22.5 Payment <br /> 43 The following two new Bid items are inserted after the Bid item "Plastic Crosshatch <br /> 1 44 Marking", per linear foot: <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 1/4/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.