My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 "Painted Wide Dotted Entry Line", per linear foot. <br /> 3 <br /> 4 "Plastic Wide Dotted Entry Line", per linear foot. <br /> 5 <br /> 6 9-03.AP9 <br /> 7 Section 9-03, Aggregates <br /> 8 January 4, 2016 <br /> 9 9-03.21(1)B Concrete Rubble <br /> 10 This section, including title, is revised to read: <br /> 11 <br /> 12 9-03.21(1)B Recycled Concrete Aggregate <br /> 13 Recycled concrete aggregates are coarse and fine aggregates manufactured from <br /> 14 hardened concrete mixtures. <br /> 15 <br /> 16 Recycled concrete, in any form, shall not be placed below the ordinary high water mark <br /> 17 of any water of the State. <br /> 18 <br /> 19 9-04.AP9 <br /> 20 Section 9-04, Joint and Crack Sealing Materials <br /> 21 January 4, 2016 <br /> 22 9-04.2(1) Hot Poured Joint Sealants <br /> 23 This section's content is deleted and replaced with the following new subsections: <br /> 24 <br /> 25 9-04.2(1)A Hot Poured Sealant <br /> 26 Hot poured sealant shall be sampled in accordance with ASTM D5167 and tested in <br /> 27 accordance with ASTM D5329. Hot poured sealant shall have a minimum Cleveland <br /> 28 Open Cup Flash Point of 205°C in accordance with AASHTO T 48. <br /> 29 <br /> 30 9-04.2(1)A1 Hot Poured Sealant for Cement Concrete Pavement <br /> 31 Hot poured sealant for cement concrete pavement shall meet the requirements of <br /> 32 ASTM D6690 Type IV, except for the following: <br /> 33 <br /> 34 1. The Cone Penetration at 25°C shall be 130 maximum. <br /> 35 <br /> 36 2. The extension for the Bond, non-immersed, shall be 100 percent. <br /> 37 <br /> 38 9-04.2(1)A2 Hot Poured Sealant for Bituminous Pavement <br /> 39 Hot poured sealant for bituminous pavement shall meet the requirements of ASTM <br /> 40 D6690 Type II. <br /> 41 <br /> 42 9-04.2(1)B Sand Slurry for Bituminous Pavement <br /> 43 Sand slurry is mixture consisting of the following components measured by total weight: <br /> 44 <br /> 45 1. Twenty percent CSS-1 emulsified asphalt, <br /> 46 <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 1/4/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.