My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I csli_ <br /> I <br /> 12' 04... ...44040' 28' f 12 <br /> STRIPE GAP STRIPE "-1 `rl <br /> LANE WIDTH <br /> I LANE STRIPE (WHITE) MEASUREMENT POINT <br /> L <br /> N <br /> I <br /> 111 12' _ 28' �i I12' d-� <br /> I STRIPE <br /> 40' GAP STRIPE <br /> I <br /> LANE WIDTH <br /> MEASUREMENT POINT <br /> TWO WAY LEFT TURN STRIPE (YELLOW) <br /> I ..,..,,_� <br /> 1 <br /> f <br /> I 1 <br /> , t <br /> LANE WIDTH <br /> I MEASUREMENT POINT <br /> DOUBLE YELLOW CENTER STRIPE <br /> O <br /> M <br /> N VEHICLE LANE WIDTH <br /> o N <br /> MEASUREMENT POINT WHEN ,'.1 3� <br /> o USED AS BICYCLE STRIPE <br /> 0N <br /> M <br /> A LANE WIDTHMEASUREMENT <br /> 0 <br /> 04 POINT WHEN USED AS GORE <br /> 1 " OR EDGE STRIP <br /> o GORE, X=8"; EDGE, W=4"; BICYCLE, W= 8" <br /> 0 <br /> CV <br /> I E GORE, EDGE, AND BICYCLE STRIPE (WHITE) <br /> 2 tcLJ 1■+ <br /> Im <br /> n <br /> 0 <br /> A <br /> 11\ <br /> h <br /> 12' __ -mei <br /> �! 12' 1 <br /> STRIPE GAP STRIPE <br /> 40' <br /> 0 LANE WIDTH <br /> No MEASUREMENT POINT <br /> SKIP CENTER STRIPE (YELLOW) <br /> !- <br /> ,„ <br /> cn <br /> a. <br /> CITY OF EVERETT $-14-2001 <br /> PUBLIC WORKS PAINT STRIPING DETAILS date <br /> E.ETT ENGINEERING & PUBLIC 720 <br /> iSERVICES DEPARTMENT number <br />
The URL can be used to link to this page
Your browser does not support the video tag.