My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page l0ofl6 I <br /> Snohomish Power Equipment Operators- Brokk - Remote Demolition $53.57 7A 3C 8P C <br /> Underground Sewer a Water Equipment <br /> I <br /> !Snohomish Power Equipment Operators- Brooms $53.57 7A 3C 8P <br /> Underground Sewer Et Water <br /> Snohomish Power Equipment Operators- Bump Cutter $56.44 7A 3C 8P <br /> I <br /> i Underground Sewer Et Water <br /> Snohomish Power Equipment Operators- Cableways $56.94 7A 3C 8P <br /> p Underground Sewer Et Water <br /> Snohomish Power Equipment Operators- Chipper $56.44 7A 3C 8P I <br /> Underground Sewer Et Water <br /> ;Snohomish Power Equipment Operators- Compressor $53.57 7A 3C 8P <br /> I <br /> Underground Sewer a Water <br /> ;Snohomish Power Equipment Operators- Concrete Pump: Truck Mount $56.94 7A 3C 8P <br /> Underground Sewer a Water With Boom Attachment Over 42 M <br /> Snohomish Power Equipment Operators- Concrete Finish Machine -laser $53.57 7A 3C 8P <br /> i Underground Sewer a Water Screed <br /> ;Snohomish Power Equipment Operators- Concrete Pump - Mounted Or $56.00 7A 3C 8P I <br /> Underground Sewer Et Water Trailer High Pressure Line Pump, <br /> P___ Pump High Pressure. 1 <br /> Snohomish Power Equipment Operators- Concrete Pump: Truck Mount $56.44 7A 3C 8P , <br /> Underground Sewer a Water With Boom Attachment Up To <br /> 42m <br /> Snohomish Power Equipment Operators- Conveyors $56.00 7A 3C 8P <br /> i Underground Sewer Et Water111 <br /> !Snohomish Power Equipment Operators- Cranes Friction: 200 tons and $58.67 7A 3C 8P <br /> 1 Underground Sewer a Water over I Snohomish Power Equipment Operators- Cranes: 20 Tons Through 44 Tons $56.44 7A 3C 8P <br /> Underground Sewer a Water With Attachments <br /> Snohomish Power Equipment Operators- Cranes: 100 Tons Through 199 $57.51 7A 3C 8P <br /> I <br /> Underground Sewer a Water Tons, Or 150' Of Boom (Including <br /> Jib With Attachments) <br /> Snohomish Power Equipment Operators- Cranes: 200 tons- 299 tons, or $58.10 7A 3C 8P <br /> Underground Sewer a Water 250' of boom including jib with , <br /> !, attachments <br /> Snohomish Power Equipment Operators- Cranes: 300 tons and over or 300' $58.67 7A 3C 8P <br /> ! Underground Sewer a Water of boom including jib with <br /> I <br /> attachments <br /> Snohomish Power Equipment Operators- Cranes: 45 Tons Through 99 Tons, $56.94 7A 3C 8P <br /> Underground Sewer a Water Under 150' Of Boom (including Jib <br /> I <br /> With Attachments) <br /> Snohomish Power Equipment Operators- <br /> 1 Underground Sewer a Water Cranes: A-frame 10 Tons And <br /> Under $53.57 7A 3C 8P <br /> I <br /> Snohomish Power Equipment Operators- Cranes: Friction cranes through $58.10 7A 3C 8P <br /> Underground Sewer Et Water 199 tons <br /> Snohomish Power Equipment Operators- Cranes: Through 19 Tons With $56.00 7A 3C 8P <br /> II <br /> Underground Sewer a Water Attachments A-frame Over 10 <br /> Tons <br /> !Snohomish Power Equipment Operators- Crusher $56.44 7A 3C 8P <br /> i Underground Sewer Et Water I <br /> !Snohomish Power Equipment Operators- Deck Engineer/deck Winches $56.44 7A 3C 8P <br /> ! Underground Sewer a Water (power) <br /> I <br /> Snohomish Power Equipment Operators- Derricks, On Building Work $56.94 7A 3C 8P <br /> i Underground Sewer Et Water <br /> !Snohomish Power Equipment Operators- Dozers D-9 Et Under $56.00 7A 3C 8P I <br /> https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/16/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.