My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Page 11 of 16 <br /> E Underground Sewer Et Water <br /> Snohomish Power Equipment Operators- Drill Oilers: Auger Type, Truck Or $56.00 7A 3C 8P <br /> Underground Sewer Et Water Crane Mount <br /> 'Snohomish Power Equipment Operators- Drilling Machine $57.51 7A 3C 8P <br /> II Underground Sewer Et Water <br /> 'Snohomish Power Equipment Operators- Elevator And Man-lift: Permanent $53.57 7A 3C 8P <br /> 1 Underground Sewer Et Water And Shaft Type <br /> I ;Snohomish Power Equipment Operators- Finishing Machine, Bidwell And $56.44 7A 3C 8P <br /> I Underground Sewer Et Water Gamaco a Similar Equipment <br /> Snohomish Power Equipment Operators- Forklift: 3000 Lbs And Over With $56.00 7A 3C 8P <br /> IUnderground Sewer Et Water Attachments <br /> !Snohomish Power Equipment Operators- Forklifts: Under 3000 Lbs. With $53.57 7A 3C 8P <br /> r Underground Sewer Et Water Attachments <br /> I !Snohomish Power Equipment Operators- Grade Engineer: Using Blue $56.44 7A 3C 8P <br /> Underground Sewer Et Water Prints, Cut Sheets, Etc <br /> 'Snohomish Power Equipment Operators- Gradechecker/stakeman $53.57 7A 3C 8P <br /> I ( Underground Sewer Et Water <br /> !Snohomish Power Equipment Operators- Guardrail Punch $56.44 7A 3C 8P <br /> Underground Sewer Et Water <br /> Snohomish Power Equipment Operators- Hard Tail End Dump Articulating $56.94 7A 3C 8P <br /> ' Underground Sewer Et Water Off- Road Equipment 45 Yards. Et <br /> Over <br /> ISnohomish Power Equipment Operators- Hard Tail End Dump Articulating $56.44 7A 3C 8P <br /> i Underground Sewer Et Water Off-road Equipment Under 45 <br /> 1 Yards <br /> I ;Snohomish Power Equipment Operators- Horizontal/directional Drill $56.00 7A 3C 8P l <br /> Underground Sewer Et Water Locator <br /> 'Snohomish Power Equipment Operators- Horizontal/directional Drill $56.44 7A 3C 8P1 <br /> I <br /> 1 Underground Sewer Et Water Operator <br /> 'Snohomish Power Equipment Operators- Hydralifts/boom Trucks Over 10 $56.00 7A 3C 8P <br /> ! Underground Sewer Et Water Tons <br /> I `Snohomish Power Equipment Operators- <br /> Hydralifts/boom Trucks, 10 Tons $53.57 7A 3C 8P <br /> Underground Sewer Et Water And Under <br /> ' <br /> 'Snohomish Power Equipment Operators- Loader, Overhead 8 Yards. Et $57.51 7A 3C 8P <br /> IUnderground Sewer Et Water Over <br /> Snohomish Power Equipment Operators- Loader, Overhead, 6 Yards. But $56.94 7A 3C 8P <br /> 1 Underground Sewer Et Water Not Including 8 Yards <br /> ISnohomish Power Equipment Operators- Loaders, Overhead Under 6 Yards $56.44 7A 3C 8P <br /> 1 Underground Sewer Et Water <br /> Snohomish Power Equipment Operators- Loaders, Plant Feed $56.44 7A 3C 8P <br /> Underground Sewer Et Water <br /> !Snohomish Power Equipment Operators I Loaders: Elevating Type Belt $56.00 7A 3C 8P <br /> 1 Underground Sewer £t Water <br /> I <br /> 'Snohomish Power Equipment Operators Locomotives, All $56.44 7A 3C 8P <br /> Underground Sewer Et Water <br /> !Snohomish Power Equipment Operators- Material Transfer Device $56.44 7A 3C 8P <br /> Underground Sewer Et Water <br /> !Snohomish Power Equipment Operators- Mechanics, All (leadmen - $0.50 $57.51 7A 3C 8P <br /> 1 Underground Sewer Et Water Per Hour Over Mechanic) <br /> I !Snohomish Power Equipment Operators- <br /> Motor Patrol Graders $56.94 7A 3C 8P t <br /> Underground Sewer Et Water <br /> !Snohomish Power Equipment Operators- Mucking Machine, Mole, Tunnel $56.94 7A 3C 8P <br /> I ! Underground Sewer Et Water Drill, Boring, Road Header And/or <br /> httns://fortress.wa.goy/lni/wa gelookun/nrvWagelookun.asnx 3/16/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.