My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 12 of 16 I <br /> Shield <br /> Snohomish Power Equipment Operators- Oil Distributors, Blower $53.57 7A 3C 8P I <br /> I Underground Sewer a Water Distribution Et Mulch Seeding <br /> I Operator <br /> Snohomish Power Equipment Operators- Outside Hoists (elevators And $56.00 7A 3C 8P <br /> I <br /> E Underground Sewer a Water Manlifts), Air Tuggers,strato <br /> Snohomish Power Equipment Operators- Overhead, Bridge Type Crane: 20 $56.44 7A 3C 8P <br /> I Underground Sewer a Water Tons Through 44 Tons I Snohomish Power Equipment Operators- Overhead, Bridge Type: 100 Tons $57.51 7A 3C 8P <br /> I Underground Sewer a Water And Over <br /> Snohomish Power Equipment Operators- Overhead, Bridge Type: 45 Tons $56.94 7A 3C 8P I Underground Sewer Et Water Through 99 Tons <br /> Snohomish Power Equipment Operators- Pavement Breaker $53,57 7A 3C 8P <br /> Underground Sewer a Water <br /> ! PileSnohomish Power Equipment Operators- <br /> Driver (other Than Crane $56.44 7A 3C 8P <br /> Underground Sewer & Water Mount) <br /> Snohomish Power Equipment Operators- Plant Oiler - Asphalt, Crusher $56.00 7A 3C 8P I <br /> Underground Sewer a Water I <br /> !Snohomish Power Equipment Operators- Posthole Digger, Mechanical $53.57 7A 3C 8P <br /> ! Underground Sewer Et Water I 111 <br /> !Snohomish Power Equipment Operators- Power Plant $53.57 7A 3C 8P <br /> ! Underground Sewer Et Water i <br /> [Snohomish Power Equipment Operators- Pumps - Water $53.57 7A 3C 8P I I <br /> Underground Sewer Et Water - I <br /> !Snohomish Power Equipment Operators- Quad 9, Hd 41, D10 And Over $56.94 7A 3C 8P <br /> I Underground Sewer a Water I!Snohomish Power Equipment Operators- Quick Tower - No Cab, Under 100 $53.57 7A 3C 8P <br /> I Underground Sewer a Water Feet In Height Based To Boom , <br /> Snohomish Power Equipment Operators- Remote Control Operator On $56.94 7A 3C 8P I <br /> Underground Sewer Et Water Rubber Tired Earth Moving <br /> P Equipment <br /> Snohomish Power Equipment Operators- Rigger And Bellman $53.57 7A 3C 8P E' <br /> i Underground Sewer a Water I <br /> Snohomish Power Equipment Operators- Rigger/Signal Person, Bellman $56.00 7A 3C 8P <br /> L Underground Sewer a Water (Certified) _ I Snohomish Power Equipment Operators- Rollagon $56.94 7A 3C 8P <br /> Underground Sewer a Water <br /> !Snohomish Power Equipment Operators- Roller, Other Than Plant Mix $53.57 7A 3C 8P <br /> IUnderground Sewer Et Water I <br /> Snohomish Power Equipment Operators- Roller, Plant Mix Or Multi-lift $56.00 7A 3C 8P <br /> IUnderground Sewer Et Water Materials I Snohomish Power Equipment Operators- Roto-mill, Roto-grinder $56.44 7A 3C 8P <br /> _ Underground Sewer & Water_ <br /> Snohomish Power Equipment Operators- Saws - Concrete $56.00 7A 3C 8P <br /> Underground Sewer & Water I <br /> !Snohomish Power Equipment Operators- Scraper, Self Propelled Under 45 $56.44 7A 3C 8P <br /> /_ &Underground Sewer & Water Yards ' <br /> Snohomish Power Equipment Operators- Scrapers - Concrete Carry All $56.00 7A 3C 8P <br /> I Underground Sewer a Water <br /> Snohomish Power Equipment Operators- Scrapers, Self-propelled: 45 $56.94 7A 3C 8P <br /> Underground Sewer & Water Yards And Over I <br /> !Snohomish Power Equipment Operators- Service Engineers - Equipment $56.00 7A 3C 8P <br /> Underground Sewer & Water <br /> https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 3/16/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.