My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Labor and Industries <br /> Policy Statement <br /> (Regarding the Production of "Standard" or "Non-standard" Items) <br /> Below is the department's (State L&I's) list of criteria to be used in determining whether a <br /> prefabricated item is "standard" or "non-standard". For items not appearing on <br /> WSDOT's predetermined list, these criteria shall be used by the Contractor (and the <br /> Contractor's subcontractors, agents to subcontractors, suppliers, manufacturers, and <br /> fabricators) to determine coverage under RCW 39.12. The production, in the State of <br /> ' Washington, of non-standard items is covered by RCW 39.12, and the production of <br /> standard items is not. The production of any item outside the State of Washington is not <br /> covered by RCW 39.12. <br /> ' 1. Is the item fabricated for a public works project? If not, it is not subject to RCW <br /> 39.12. If it is, go to question 2. <br /> 2. Is the item fabricated on the public works jobsite? If it is, the work is covered under <br /> RCW 39.12. If not, go to question 3. <br /> 3. Is the item fabricated in an assembly/fabrication plant set up for, and dedicated <br /> ' primarily to, the public works project? If it is, the work is covered by RCW 39.12. If not, <br /> go to question 4. <br /> ' 4. Does the item require any assembly, cutting, modification or other fabrication by the <br /> supplier? If not, the work is not covered by RCW 39.12. If yes, go to question 5. <br /> 5. Is the prefabricated item intended for the public works project typically an inventory <br /> ' item which could reasonably be sold on the general market? If not, the work is covered <br /> by ROW 39.12. If yes, go to question 6. <br /> 6. Does the specific prefabricated item, generally defined as standard, have any <br /> unusual characteristics such as shape, type of material, strength requirements, finish, <br /> etc? If yes, the work is covered under RCW 39.12. <br /> ' Any firm with questions regarding the policy, WSDOT's Predetermined List, or for <br /> determinations of covered and non-covered workers shall be directed to State L&I at <br /> (360) 902-5330. <br /> 1 <br /> I <br /> Supplemental to Wage Rates 1 <br /> 03/02/2016 Edition, Published February 1st, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.