My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 shape, or the final finish is considered a manufacturing process. The processes include <br /> 2 rolling, extruding, machining, bending, grinding, drilling, welding, and coating. The <br /> 3 action of applying a coating to steel or iron is deemed a manufacturing process. <br /> 4 Coating includes epoxy coating, galvanizing, aluminizing, painting, and any other <br /> 5 coating that protects or enhances the value of steel or iron. Any process from the <br /> 6 original reduction from ore to the finished product constitutes a manufacturing process <br /> 7 for iron. <br /> 8 <br /> 9 Due to a nationwide waiver, Buy America does not apply to raw materials (iron ore and <br /> 10 alloys), scrap (recycled steel or iron), and pig iron or processed, pelletized, and reduced <br /> 11 iron ore. <br /> 12 <br /> 13 The following are considered to be steel manufacturing processes: <br /> 14 <br /> 15 1. Production of steel by any of the following processes: <br /> 16 <br /> 17 a. Open hearth furnace. <br /> 18 <br /> 19 b. Basic oxygen. <br /> 20 <br /> 21 c. Electric furnace. <br /> 22 <br /> 23 d. Direct reduction. <br /> 24 <br /> 25 2. Rolling, heat treating, and any other similar processing. <br /> 26 <br /> 27 3. Fabrication of the products. <br /> 28 <br /> 29 a. Spinning wire into cable or strand. <br /> 30 <br /> 31 b. Corrugating and rolling into culverts. <br /> 32 <br /> 33 c. Shop fabrication. <br /> 34 <br /> 35 A certification of materials origin will be required for any items comprised of, or <br /> 36 containing, steel or iron construction materials prior to such items being incorporated <br /> 37 into the permanent work. The certification shall be on DOT Form 350-109EF provided <br /> 38 by the Engineer, or such other form the Contractor chooses, provided it contains the <br /> 39 same information as DOT Form 350-109EF. <br /> 40 <br /> 41 <br /> 42 1-06.1(4) Fabrication Inspection Expense <br /> 43 (June 27, 2011 AWPA GSP) <br /> 44 <br /> 45 Delete this section in its entirety. <br /> 46 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021); COE#3540 SP-24 March 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.