Laserfiche WebLink
1 from their failure, or improper maintenance, use, or operation. The Contractor shall be <br /> 2 solely and completely responsible for the conditions of the project site, including safety <br /> 3 for all persons and property in the performance of the work. This requirement shall <br /> 4 apply continuously, and not be limited to normal working hours. The required or implied <br /> 5 duty of the Engineer to conduct construction review of the Contractor's performance <br /> 6 does not, and shall not, be intended to include review and adequacy of the Contractor's <br /> 7 safety measures in, on, or near the project site. <br /> 8 <br /> 9 <br /> 10 :91727W, <br /> 11 1-07.2 State Taxes <br /> 12 <br /> 13 Delete this section, including its sub-sections, in its entirety and replace it with the following: <br /> 14 <br /> 15 1-07.2 State Sales Tax <br /> 16 (June 27, 2011 APWA GSP) <br /> 17 <br /> 18 The Washington State Department of Revenue has issued special rules on the State <br /> 19 sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The <br /> 20 Contractor should contact the Washington State Department of Revenue for answers to <br /> 21 questions in this area. The Contracting Agency will not adjust its payment if the <br /> 22 Contractor bases a bid on a misunderstood tax liability. <br /> 23 <br /> 24 The Contractor shall include all Contractor-paid taxes in the unit bid prices or other <br /> 25 contract amounts. In some cases, however, state retail sales tax will not be included. <br /> 26 Section 1-07.2(2) describes this exception. <br /> 27 <br /> 28 The Contracting Agency will pay the retained percentage (or release the Contract Bond <br /> 29 if a FHWA-funded Project) only if the Contractor has obtained from the Washington <br /> 30 State Department of Revenue a certificate showing that all contract-related taxes have <br /> 31 been paid (RCW 60.28.051). The Contracting Agency may deduct from its payments to <br /> 32 the Contractor any amount the Contractor may owe the Washington State Department of <br /> 33 Revenue, whether the amount owed relates to this contract or not. Any amount so <br /> 34 deducted will be paid into the proper State fund. <br /> 35 <br /> 36 1-07.2(1) State Sales Tax — Rule 171 <br /> 37 <br /> 38 WAC 458-20-171, and its related rules, apply to building, repairing, or improving streets, <br /> 39 roads, etc., which are owned by a municipal corporation, or political subdivision of the <br /> 40 state, or by the United States, and which are used primarily for foot or vehicular traffic. <br /> 41 This includes storm or combined sewer systems within and included as a part of the <br /> 42 street or road drainage system and power lines when such are part of the roadway <br /> 43 lighting system. For work performed in such cases, the Contractor shall include <br /> 44 Washington State Retail Sales Taxes in the various unit bid item prices, or other contract <br /> 45 amounts, including those that the Contractor pays on the purchase of the materials, <br /> 46 equipment, or supplies used or consumed in doing the work. <br /> 47 <br /> 48 1-07.2(2) State Sales Tax — Rule 170 <br /> 49 <br /> 50 WAC 458-20-170, and its related rules, apply to the constructing and repairing of new or <br /> 51 existing buildings, or other structures, upon real property. This includes, but is not <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021); COE#3540 SP-26 March 16, 2016 <br />