Laserfiche WebLink
Regulatory Distance From <br /> Posted Speed Traveled Way <br /> (Feet) <br /> 35 mph or less 10 * <br /> 40 mph 15 <br /> 45 to 55 mph 20 <br /> 60 mph or greater 30 <br /> 1 * or 2-feet beyond the outside edge of sidewalk <br /> 2 <br /> 3 Minimum Work Zone Clear Zone Distance <br /> 4 <br /> 5 El- 7.23(1 ,, PT54 DOCX <br /> 6 (January 5, 2015) <br /> 7 Lane closures are subject to the following restrictions: <br /> 8 <br /> 9 ***, One lane with alternating flagger control is permitted at any time. <br /> 10 Shoulder closure is permitted at anytime. *** <br /> 11 <br /> 12 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> 13 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> 14 in writing of any change in the closure hours. <br /> 15 <br /> 16 Lane closures are not allowed on any of the following: <br /> 17 <br /> 18 1. A holiday, <br /> 19 <br /> 20 2. A holiday weekend; holidays that occur on Friday, Saturday, Sunday or <br /> 21 Monday are considered a holiday weekend. A holiday weekend includes <br /> 22 Saturday, Sunday, and the holiday. <br /> 23 <br /> 24 3. After*** 3:00 pm *** on the day prior to a holiday or holiday weekend, and <br /> 25 <br /> 26 4. Before *** 7:00 am *** on the day after the holiday or holiday weekend. <br /> 27 <br /> 28 <br /> 29 1107i�24yRTF <br /> 30 1-07.24 Rights of Way <br /> 31 (July 23, 2015 APWA GSP) <br /> 32 <br /> 33 Delete this section and replace it with the following: <br /> 34 <br /> 35 Street Right of Way lines, limits of easements, and limits of construction permits are <br /> 36 indicated in the Plans. The Contractor's construction activities shall be confined within <br /> 37 these limits, unless arrangements for use of private property are made. <br /> 38 <br /> 39 Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of <br /> 40 way and easements, both permanent and temporary, necessary for carrying out the <br /> 41 work. Exceptions to this are noted in the Bid Documents or will be brought to the <br /> 42 Contractor's attention by a duly issued Addendum. <br /> 43 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021);COE#3540 SP-56 March 16,2016 <br />