My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8 .N.5 1 R1', <br /> 2 The first sentence of Section 1-08.4 is revised to read: <br /> 3 <br /> 4 1=08 4GR1 <br /> 5 Prosecution of Work <br /> 6 <br /> 7 ri-08 4 INSW GR15 <br /> 8 The first sentence of Section 1-08.4 is revised to read: <br /> 9 <br /> 10 F1 08!4§OPT3tdocx <br /> 11 (August 7, 2006) <br /> 12 The Contractor shall begin work no earlier than *** Tuesday July 5th, 2016' ***. <br /> 13 <br /> 14 1 084 RTF <br /> 15 1-08.4 Prosecution of Work <br /> 16 <br /> 17 Delete this section and replace it with the following: <br /> 18 <br /> 19 1-08.4 Notice to Proceed and Prosecution of Work <br /> 20 (July 23, 2015 APWA GSP) <br /> 21 <br /> 22 Notice to Proceed will be given after the contract has been executed and the contract <br /> 23 bond and evidence of insurance have been approved and filed by the Contracting <br /> 24 Agency. The Contractor shall not commence with the work until the Notice to Proceed <br /> 25 has been given by the Engineer. The Contractor shall commence construction activities <br /> 26 on the project site within ten days of the Notice to Proceed Date, unless otherwise <br /> 27 approved in writing. The Contractor shall diligently pursue the work to the physical <br /> 28 completion date within the time specified in the contract. Voluntary shutdown or slowing <br /> 29 of operations by the Contractor shall not relieve the Contractor of the responsibility to <br /> 30 complete the work within the time(s) specified in the contract. <br /> 31 <br /> 32 When shown in the Plans, the first order of work shall be the installation of high visibility <br /> 33 fencing to delineate all areas for protection or restoration, as described in the Contract. <br /> 34 Installation of high visibility fencing adjacent to the roadway shall occur after the <br /> 35 placement of all necessary signs and traffic control devices in accordance with 1-10.1(2). <br /> 36 Upon construction of the fencing, the Contractor shall request the Engineer to inspect <br /> 37 the fence. No other work shall be performed on the site until the Contracting Agency has <br /> 38 accepted the installation of high visibility fencing, as described in the Contract. <br /> 39 <br /> 40 `1*08ft :GR1 <br /> 41 Time for Completion <br /> 42 <br /> 43 1 085INST1"CR1 <br /> 44 The third paragraph of Section 1-08.5 is revised to read: <br /> 45 _ <br /> 46 F1©8. 5 OPT2 WORK1 ;G DAXSiD®GX <br /> 47 (August 7, 2006) <br /> 48 Contract time shall begin on the first working day. The first working day shall be *** <br /> 49 Tuesday%July 5th;,2016'. <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021); COE#3540 SP-61 March 16, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.