My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 Adjustments will be based on the most current reference cost for Western Washington <br /> 3 or Eastern Washington as posted on the Agency website, depending on where the work <br /> 4 is performed. For work completed after all authorized working days are used, the <br /> 5 adjustment will be based on the posted reference cost during which contract time was <br /> 6 exhausted. The adjustment will be calculated as follows: <br /> 7 <br /> 8 No adjustment will be made if the reference cost is within 5% of the base cost. <br /> 9 <br /> 10 If the reference cost is greater than or equal to 105% of the base cost, then <br /> 11 Adjustment = (Current Reference Cost— (1.05 x Base Cost)) x (Q x 0.056). <br /> 12 <br /> 13 If the reference cost is less than or equal to 95% of the base cost, then <br /> 14 Adjustment = (Current Reference Cost— (0.95 x Base Cost)) x (Q x 0.056). <br /> 15 <br /> 16 Where Q = total tons of all classes of HMA paid in the current month's progress <br /> 17 payment. <br /> 18 <br /> 19 "Asphalt Cost Price Adjustment", by calculation. <br /> 20 <br /> 21 "Asphalt Cost Price Adjustment" will be calculated and paid for as described in this <br /> 22 section. For the purpose of providing a common proposal for all bidders, the <br /> 23 Contracting Agency has entered an amount in the proposal to become a part of the total <br /> 24 bid by the Contractor. <br /> 25 <br /> 26 v0 <br /> 27 5-04.5(1)B Price Adjustments for Quality of HMA Compaction <br /> 28 (January 16, 2014 APWA GSP) <br /> 29 <br /> 30 Delete this section and replace it with the following: <br /> 31 <br /> 32 The maximum CPF of a compaction lot is 1.00. <br /> 33 <br /> 34 For each compaction lot of HMA when the CPF is less than 1.00, a Nonconforming <br /> 35 Compaction Factor (NCCF) will be determined. THE NCCF equals the algebraic difference <br /> 36 of CPF minus 1.00 multiplied by 40 percent. The Compaction Price Adjustment will be <br /> 37 calculated as the product of the NCCF, the quantity of HMA in the lot in tons and the unit <br /> 38 contract price per ton of the mix. <br /> 39 <br /> 40 Nb D iSlO... <br /> 41 <br /> 42 <br /> 43 END DIVISION 5 <br /> 44 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021); COE#3540 SP-72 March 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.