My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 DIVIS10, 6tGR6 <br /> 2 Division 6 <br /> 3 Structures <br /> 4 <br /> 5 #971176—.K4 <br /> 6 Structural Earth Walls <br /> 7 <br /> 8 6 ,j3r2TG R6 <br /> 9 Materials <br /> 10 <br /> 11 640 MODULAR LOCK VLDOd <br /> 12 6-20 MODULAR CONCRETE BLOCK WALL <br /> 13 (******) <br /> 14 <br /> 15 Section 6-20 is new with the following: <br /> 16 <br /> 17 6-20.1 Description <br /> 18 <br /> 19 Work includes furnishing and installing Modular Concrete Block Wall as indicated on the <br /> 20 plans and the details in the plans and as specified herein. The face of the wall shall offer a <br /> 21 rock-face type appearance. Modular block units shall be similar to "Key Stone", "Allan <br /> 22 Block", MESA wall or as approved by the ENGINEER. The color of modular block shall be <br /> 23 gray. <br /> 24 <br /> 25 This work also includes preparing foundation soil, furnishing and installing leveling pad, unit <br /> 26 fill and backfill and furnishing and installing all appurtenant materials required for <br /> 27 construction of the retaining wall as shown on the details and plans. <br /> 28 <br /> 29 Submit sample of each different unit for approval. <br /> 30 <br /> 31 Submit shop drawings of the wall layout for approval prior to beginning work on the wall. <br /> 32 Shop drawings of walls over six feet in height shall bear the stamp of an engineer registered <br /> 33 to practice in the State of Washington showing appropriate wall stability calculations. <br /> 34 <br /> 35 Submittals <br /> 36 <br /> 37 Installation shall conform to the manufacturer's recommendations for the type of unit <br /> 38 furnished. <br /> 39 <br /> 40 The Contractor shall submit catalog cuts of the modular blocks and shop drawings of the <br /> 41 wall layout for approval prior to beginning the work. <br /> 42 <br /> 43 Provide copies of the manufacturers' installation at least two weeks prior to beginning the <br /> 44 work. Should a conflict arise between these specifications and the manufacturer's <br /> 45 instructions, the more rigorous specification shall apply. <br /> 46 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021); COE#3540 SP-73 March 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.