Laserfiche WebLink
1 Red paint shall comply with the requirements of yellow paint in Section 9-34.2(4) <br /> 2 and Section 9-34.2(5), with the exception that red paint does not need to meet the <br /> 3 requirements for titanium dioxide, directional reflectance, and contrast ratio. For <br /> 4 red, the color shall closely match Federal Standard 595, color number 31136 or <br /> 5 11086. <br /> 6 <br /> 7 8-04.5 Payment <br /> 8 <br /> 9 Section 8-04.5 is supplemented with the following: <br /> 10 <br /> 11 "Cement Concrete Curb and Gutter Type A-1," per Linear Foot. <br /> 12 "Cement Concrete Curb Type ," per Linear Foot. <br /> 13 "Extruded Asphalt Concrete Curb," per Linear Foot. <br /> 14 "Extruded Cement Concrete Curb," per Linear Foot. <br /> 15 <br /> 16 All labor, equipment, materials and incidentals, installation of curb depressions for <br /> 17 driveway cuts and wheelchair ramps, including forms, necessary to perform the work <br /> 18 shall be incidental to these items and no separate payment will be made. <br /> 19 <br /> 20 "Painted Traffic Curb," per Linear Foot, shall be measured along the front face of curb. <br /> 21 The unit Contract price per linear foot shall be full payment for all costs associated with <br /> 22 the specified work. <br /> 23 <br /> 24 <br /> 25 CC)n &'1aD1if r&CURB RAMP F <br /> 26 8-14 CEMENT CONCRETE SIDEWALKS <br /> 27 8-14.3 Construction Requirements <br /> 28 <br /> 29 Section 8-14.3 shall be deleted and replaced with the following: <br /> 30 <br /> 31 (******) <br /> 32 <br /> 33 The concrete in the Cement Concrete Sidewalk shall be Commercial Mix in accordance <br /> 34 with the requirements of Section 6-02, and as defined in the City of COE Standard <br /> 35 Drawing # 306. <br /> 36 <br /> 37 8-14.3(1)Excavation <br /> 38 <br /> 39 Section 8-14.3 (1) is supplemented with the following: <br /> 40 <br /> 41 (******) <br /> 42 It is expected there will be sufficient suitable native material excavated from various <br /> 43 portions of the improvement to fill low areas in the sidewalk subgrade and planting <br /> 44 strip area when needed and no further payment will be allowed for fill material. <br /> 45 Where there is insufficient suitable native material on the project site, the <br /> 46 Contractor shall furnish, place and compact CSTC meeting the requirements of <br /> 47 Section 4-04 of these Specifications. <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021);COE#3540 SP-83 March 16,2016 <br />