My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.11 Final Inspection <br /> Delete 1-05.11 and substitute the following: <br /> 1-05.11 Final Inspections and Operational Testing <br /> (******) <br /> 1-05.11(1) Substantial Completion Date I <br /> When the Contractor considers the Work to be substantially complete, the Contractor <br /> shall so notify the Engineer and request the Engineer establish the Substantial <br /> Completion Date. The Contractor's request shall list the specific items of Work that I <br /> remain to be completed in order to reach physical completion. The Engineer will <br /> schedule an inspection of the Work with the Contractor to determine the status of <br /> completion. The Engineer may also establish the Substantial Completion Date <br /> unilaterally. <br /> If, after this inspection, the Engineer concurs with the Contractor that the Work is <br /> substantially complete and ready for its intended use, the Engineer, by written notice to <br /> the Contractor, will set the Substantial Completion Date. If, after this inspection the <br /> Engineer does not consider the Work substantially complete and ready for its intended <br /> use, the Engineer will, by written notice, so notify the Contractor giving the reasons <br /> therefore. <br /> Upon receipt of written notice concurring in or denying substantial completion, <br /> whichever is applicable, the Contractor shall pursue vigorously, diligently and without <br /> unauthorized interruption, the Work necessary to reach Substantial and Physical <br /> Completion. The Contractor shall provide the Engineer with a revised schedule <br /> indicating when the Contractor expects to reach substantial and physical completion of <br /> the Work. <br /> The above process shall be repeated until the Engineer establishes the Substantial <br /> Completion Date and the Contractor considers the Work physically complete and <br /> ready for final inspection. <br /> 1-05.11(2) Final Inspection and Physical Completion Date <br /> When the Contractor considers the Work physically complete and ready for final <br /> inspection, the Contractor, by written Notice, shall request the Engineer to schedule a <br /> final inspection. The Engineer will set a date for final inspection. The Engineer and the <br /> Contractor will then make a final inspection and the Engineer will notify the Contractor <br /> in writing of all particulars in which the final inspection reveals the Work incomplete or <br /> unacceptable. The Contractor shall immediately take such corrective measures as are <br /> necessary to remedy the listed deficiencies. Corrective work shall be pursued <br /> vigorously, diligently, and without interruption until physical completion of the listed <br /> deficiencies. This process will continue until the Engineer is satisfied the listed <br /> deficiencies have been corrected. <br /> If action to correct the listed deficiencies is not initiated within seven days after receipt <br /> of the written notice listing the deficiencies, the Engineer may, upon written notice to <br /> the Contractor, take whatever steps are necessary to correct those deficiencies <br /> pursuant to 1-05.7 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. I <br /> The Contractor will not be allowed an extension of Contract Time because of a Delay <br /> in the performance of the Work attributable to the exercise of the Engineer's right <br /> under the authority of the Contract. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-86 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.