My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> sufficient data to enable the City's Representative to assess the acceptability of the <br /> I <br /> material or Equipment for the particular application and requirements. The City and <br /> City's Representative are not required or obligated to consider or review a request for <br /> substitution and may, in their sole discretion and option, consider or review such <br /> requests. <br /> If the offered substitution requires changes to or coordination with other portions of the I <br /> Work, include, if any, drawings and details showing such changes. The Contractor <br /> agrees to perform these changes as part of the substitution of material or Equipment at <br /> no additional cost to the City. Approval of a substitution request will not relieve the I <br /> Contractor from responsibility for the efficiency, quality, and performance of the <br /> substitute material or Equipment, in the same manner and degree as the material and <br /> Equipment originally specified. Reflect cost differential associated with a substitution <br /> in the offer. If the City approves the substitution, the Contract Documents will be <br /> modified by a Change Order modifying the Contract Sum in the amount of the cost <br /> differential. <br /> 1-06.2 Acceptance of Materials <br /> 1-06.2(2)B Financial Incentive <br /> Delete 1-06.2(2)B. I <br /> 1-06.2(2)D Quality Level Analysis <br /> Delete 1-06.2(2)D. <br /> 1-06.3 Manufacturer's Certificate of Compliance <br /> Supplement 1-06.3 by adding the following: <br /> When authorized by the Standard Specifications or these Special Provisions and prior <br /> to use, the Engineer may accept certain Equipment on the basis of a Manufacturer's <br /> Certificate of Compliance as an alternate to Equipment inspection and testing. <br /> A Manufacturer's Certificate of Compliance shall be reserved for cases where I <br /> compliance to Contract requirements is not readily determinable through inspection <br /> and testing of materials or Equipment. The Contractor shall provide properly <br /> authenticated documents to the City's Representative that the materials and <br /> Equipment comply with the Contract requirements. <br /> The Contractor shall pay all associated costs of providing each Manufacturer's <br /> Certificate of Compliance submitted for City acceptance. <br /> The City reserves the right to refuse to accept Equipment on the basis of a <br /> Manufacturer's Certificate of Compliance. <br /> 1-06.3(1) Inspection at Point of Manufacturing I <br /> The Contractor shall be responsible to reimburse the City for the costs of inspections <br /> at the point of manufacturing for inspections occurring outside of Whatcom, Skagit, <br /> Island, Snohomish, King, Pierce and Thurston counties. Costs to be paid or <br /> reimbursed by the Contractor include, but are not limited to, travel, subsistence, labor <br /> and lodging expenses of the City Inspector. <br /> Point of manufacturing inspection will be required if: <br /> Inspection and testing of materials or Equipment in the vicinity of the Work by the <br /> City is not practicable, <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.— UP3470-10 Division 1 —GENERAL REQUIREMENTS April 2016 <br /> SP—94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.