My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' VISIONS <br /> CITY OF EVERETT SPECIAL PRO <br /> I _ - The Contractor requests the City to inspect and test material or Equipment at the <br /> point of manufacture, or <br /> IThe Standard Specifications or these Special Provisions require that inspection, <br /> testing or witnessing of tests take place at the point of manufacture. <br /> 1-06.4 Handling and Storing Materials <br /> ISupplement 1-06.4 by adding the following: <br /> Contractor shall store materials and Equipment so as to insure the preservation of their <br /> I quality and fitness for the Work. Store Equipment and materials at location that <br /> facilitates inspection. The Contractor shall be responsible for damages, loss or <br /> casualty occurring to materials and Equipment until Final Acceptance. <br /> 1 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br /> 1-07.1 Laws to be Observed <br /> I Supplement 1-07.1 by adding the following: <br /> The Contractor shall be in compliance with all applicable standards, orders, or <br /> requirements issued under Section 306 of the Clear Air Act [42 U.S.C. 1857(h)], <br /> I Section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and <br /> Environmental Protection Agency Regulations (40 CFR Part 15). (Contracts, <br /> subcontracts, and subgrants of amounts in excess of$100,000). <br /> I The Contractor shall comply with mandatory standards and policies relating to energy <br /> efficiency that are contained in the state energy conservation plan issued in <br /> compliance with the Energy Policy and Conservation Act (Pub. L. 94-163). <br /> I The City advises all general contractors and subcontractors that numerous Federal, <br /> State, and Local regulations exist that could affect the procedures used in the <br /> completion of this project. The City advises each prospective Contractor that they are <br /> I responsible to be aware of and comply with all applicable statutes and regulations. It <br /> is recommended that each Contractor contact the local office of the following agencies <br /> for a list of applicable regulations and requirements that might affect the <br /> implementation of this project: <br /> I • Federal Environmental Protection Agency <br /> • Washington Department of Health <br /> • Washington Department of Ecology <br /> • Washington Department of Fisheries <br /> • Washington Department of Wildlife <br /> I • Washington Department of Labor & Industries <br /> • Puget Sound Air Pollution Control Agency <br /> • Municipal Building Department <br /> • Municipal Planning Department <br /> • Municipal Public Works Department <br /> If the scope of Work in this Contract includes Work at the City of Everett Water <br /> I Filtration Plant or the Waste Water Pollution Control Facility, Contractor shall comply <br /> with the requirements of the Washington Department of Labor & Industries for such <br /> work including, but not limited to, Chapter 296-67 WAC. All costs associated or <br /> incurred in complying with these regulations or any other regulations listed above are <br /> Iincluded in the Contractor's Proposal. <br /> I SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.