My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall be responsible for determining the exact location, including <br /> service connections, of all public and private underground utilities marked at the site of <br /> ' the Work. Perform field verification prior to beginning Work that could result in damage <br /> to buried utilities, including but not limited to exploratory excavations, in sufficient time <br /> so as not to impede the progress of the Work or fabrication of materials to be <br /> ' incorporated into the Work. The Contractor shall immediately notify the City's <br /> Representative as to any utility discovered by him in a different position than shown on <br /> the Plans or that is not shown on the Plans. <br /> ' No excavation shall begin until all known underground public and private utilities in the <br /> vicinity of the excavation area have been located and marked. <br /> Utilities of record are shown on the Plans insofar as it is possible to do so. Failure of <br /> the City to show the existence of subsurface objects or installation on the Plans shall <br /> not relieve the Contractor from its responsibility to make an independent check on the <br /> ground, nor relieve Contractor from all liability for damages resulting from its <br /> ' operations. <br /> It shall be entirely the responsibility of the Contractor to give proper notification to the <br /> agencies that have utilities in place and to coordinate with these agencies in the <br /> ' protection and relocation of the various underground installations. These agencies will <br /> give assistance in the location of the various utilities, but this shall not relieve the <br /> Contractor from responsibility for any damage incurred. The City shall require a <br /> ' notification of at least five working days. The Contractor shall hold the City harmless <br /> against any claim of any nature resulting from Delays in attending to same. <br /> Following are addresses and telephone numbers of utilities in the Everett area for the <br /> Contractor's convenience: <br /> Snohomish County PUD #1 City of Everett, Sanitary Sewer Div <br /> ' P.O. Box 1107 <br /> Everett, Washington 98206 City of Everett, Water Division <br /> Public Works Department <br /> Attn: Erin Burke 3200 Cedar Street <br /> ' Tel. (425) 783-4745 Everett, Washington 98201 <br /> Email: EFBurke@SNOPUD.com Attn: Mark Sadler <br /> Tel. (425) 257-8800 <br /> Puget Sound Energy City of Everett, Water Division <br /> P.O. Box 97034 BOT-01G Public Works Department <br /> Bellevue, WA 98009-9734 3200 Cedar Street <br /> Attn: Lisa Griffith Everett, Washington 98201 <br /> Tel. (425) 424-6472 Attn: Mark Sadler <br /> Email: Lisa.Griffith@pse.com Tel. (425) 257-8800 <br /> 111 <br /> ' SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.— UP3470-10 Division 1 —GENERAL REQUIREMENTS April 2016 <br /> SP- 103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.