My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Frontier Communications NW City of Everett, Storm Water Division <br /> Attn: Tim Rennick 3200 Cedar Street <br /> 1800 41st St Everett, Washington 98201 <br /> M/C WA0104OS Attn: Mark Sadler <br /> Everett, Washington 98201 Tel. (425) 257-8885 <br /> Tel. 425-263-4023 <br /> Emailtim.rennick@ftr.com <br /> Comcast City of Everett, Traffic Division ' <br /> 1525 75th Street SW#200 Public Works Department <br /> Everett, Washington 98203 3200 Cedar Street <br /> Casey Brown Everett, Washington 98201 <br /> (425) 754-0064 Attn: Tim Miller <br /> Tel. (425) 257-8800 <br /> 1-07.17(1) Utility Construction, Removal or Relocation by Contractor <br /> Delete all three paragraphs of 1-07.17(1) and substitute the following: <br /> If the Work requires removing or relocating a utility, utility owners or their <br /> contractors will furnish all work necessary to adjust, relocate, replace, or construct <br /> their facilities. <br /> 1-07.17(2) Utility Construction, Removal or Relocation by Others <br /> Revise the first paragraph of 1-07.17(2) as follows: <br /> Any authorized agent of the City or utility owners may enter the City right-of-way ' <br /> or easement to repair, rearrange, alter, or connect their equipment. The Contractor <br /> shall cooperate with such effort and shall avoid creating delays or hindrances to <br /> those doing the Work. The Contractor shall arrange to coordinate work schedules <br /> as needed. <br /> 1-07.18 Public Liability and Property Damage Insurance <br /> Delete 1-07.18 and substitute the following: ' <br /> 1-07.18 Insurance <br /> (******) <br /> 1-07.18(1) General Requirements <br /> The Contractor shall obtain the insurance described in this section from insurers <br /> approved by the State Insurance Commissioner pursuant to RCW Title 48. The <br /> insurance shall be provided by an insurer with a rating of A-: VII or higher in the A.M. <br /> Best's Key Rating Guide, that is licensed to do business in the state of Washington, or <br /> issued as a surplus line by a Washington Surplus lines broker. The City reserves the <br /> right to approve or reject the insurance provided, based on the insurer (including <br /> financial condition), terms and coverage, the Certificate of Insurance, and <br /> endorsements. <br /> The Contractor shall keep this insurance in force during the term of the Contract and <br /> for 30 calendar days after the Physical Completion date, unless otherwise indicated in <br /> 1-07.18(1)C of this section. <br /> If any insurance policy is written on a claims made form, its retroactive date, and that <br /> of all subsequent renewals, shall be no later than the effective date of this <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP - 104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.