My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> n <br /> If insurance is on a claims made form, its retroactive date, and that of all <br /> subsequent renewals, shall be no later than the effective date of this Contract. <br /> 1-07.18(5)H Builder's Risk <br /> If the Project includes construction of a structure, the Contractor shall maintain <br /> property insurance under an "All Risk Builder's Risk" form in an amount equal to <br /> the value of the structure in a form acceptable to the City. The structure shall <br /> have All Risk Builder's Risk Insurance inclusive of earthquake and flood subject to <br /> customary industry deductibles. <br /> 1-07.20 Patented Devices, Materials, and Processes <br /> Delete the first paragraph of 1-07.20 and substitute the following: <br /> The Contractor shall assume all costs arising from the use of patented devices, <br /> materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br /> defend, and save harmless the City, and its officers, employees and agents from all <br /> actions of any nature for, or on account of the use of any patented devices, materials, <br /> or processes. <br /> 1-07.23 Public Convenience and Safety <br /> Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br /> Nothing contained in this Contract is intended to create any third-party beneficiary <br /> rights in favor of the public or any individual utilizing the facilities being constructed or <br /> improved under this Contract. , <br /> 1-07.23(1) Construction Under Traffic <br /> Supplement 1-07.23(1) by adding the following after item 5 in the second paragraph: <br /> Provide a uniformed off-duty Police Officer to control traffic in critical situations as <br /> determined by the Engineer. The uniformed officer shall be paid under contract <br /> item "Traffic Control Labor". <br /> Notify the local Fire, Police and Engineering Departments before the beginning of <br /> each phase of construction so that these agencies may re-route their emergency <br /> vehicles around the construction zone. The non-emergency phone number for <br /> Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public Works <br /> Engineering is 257-8800. <br /> Notify City of Everett Transit at 425-257-8984 and Community Transit at 425-348- <br /> 7100 of all street closures or delays at least 24 hours in advance to enable <br /> rerouting of buses. <br /> Notify the property owners at least 72 hours in advance to enable them to remove <br /> vehicles parked in the vicinity of Work. Towing vehicles shall be the responsibility <br /> of the Contractor and no additional payment will be made. <br /> Further supplement 1-07.23(1) by adding the following: <br /> 1-07.23(1)A General Requirements Traffic <br /> (******) <br /> The following general requirements apply to all Work on the Project: <br /> Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br /> 10.2(2) TRAFFIC CONTROL PLANS. <br /> Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br /> construction constraints resulting from traffic control. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 - GENERAL REQUIREMENTS April 2016 <br /> SP-108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.